Direct answer: A testing, inspection and certification (TIC) procurement page is not "ask a lab for a price". The page should state: whether the service is testing, inspection, certification, calibration or management-system certification; whether the body holds CMA qualification, CNAS accreditation or certification-body approval, and whether the certificate number, scope, validity and site cover this project; who samples, identifies, hands over and stores the sample, and who is responsible for its representativeness and authenticity; the method/standard and version, deviations and witnessing; report/certificate elements (seal, authorised signatory, CMA mark, standard basis, subcontract disclosure, correction marking, retention of at least six years); whether subcontracting obtained prior client consent and is stated in the report; result liability, re-test/re-inspection, indemnity and confidentiality; price, turnaround, sample disposal and supplier performance. On the rules: the Inspection and Testing Body Qualification Accreditation Measures govern the CMA certificate, scope, CMA mark on reports and the prohibition on transferring/lending certificates or marks; the Inspection and Testing Body Supervision and Administration Measures make the client responsible for the representativeness and authenticity of submitted samples, require prior consent to and disclosure of subcontracting, require the report seal and an authorised signatory acting within scope, require records/reports to be kept at least six years, and define untrue/false reports; the Certification and Accreditation Regulations require certification bodies to be approved and to act within the approved scope; CNAS-RL01 makes laboratory accreditation voluntary. This article is current to 2026-11-11 and is a summary of public rules and page method, not testing/certification/legal advice; the certificates, accreditation scope, contracts and regulator's determination control.
This article is for procurement, quality, R&D, regulatory, EHS and website teams at equipment, electronics, automotive-parts, medical-device, hardware, chemical, packaging and export manufacturers in Changzhou and nearby. It covers how to write and accept a TIC procurement page. The usual gap is "price only, no scope check, report without CMA mark or authorised signatory, no owner for sample representativeness, undisclosed subcontracting, outdated method, expired or out-of-scope report, no liability or re-test terms", ending with a page that only says "CNAS/CMA accredited, reports authoritative", while customer audits/regulator checks/quality disputes still disagree.
Check "qualification + scope + site + validity" before price; sample representativeness and authenticity are the client's responsibility, so keep sampling/handover/storage evidence; reports need a seal, authorised signatory, standard basis and CMA mark where applicable, subcontracting needs prior consent and disclosure, and records must be kept at least six years.
How does this page relate to calibration, quality-system certificates, supplier audits, customer inspection and service-procurement pages?
The TIC procurement page answers "how to buy testing/inspection/certification/calibration, how to accept qualifications and reports, and who is liable"; the measurement and calibration page answers "in-house measurement, mandatory verification, calibration intervals and traceability"; the quality-system certificate page answers "how to display and verify ISO 9001/IATF 16949/ISO 13485 certificates"; the supplier audit page answers "how to run a second-party audit"; the customer inspection page answers "how to host customer/third-party inspection"; the service procurement/outsourcing page answers "SOW/SLA/pricing/acceptance/exit". The TIC page is the main page for buying third-party conformity-assessment services and cannot be replaced by a calibration or outsourcing page.
Common breaks: treating CMA and CNAS as the same; checking the certificate cover but not the scope; a report without an authorised signatory; a supplier-submitted sample treated as the whole batch; undisclosed subcontracting; outdated method/standard; expired or out-of-scope report; no re-test/indemnity/confidentiality clause; supplier performance judged on price only. The page separates "service type—qualification scope—sample/method—report/certificate—contract/liability—supplier management" so procurement/quality/R&D/regulatory/EHS share one vocabulary.
| Page | Question it answers | Key content | Cannot replace |
|---|---|---|---|
| TIC procurement | How to buy testing/inspection/certification/calibration | Qualification, samples, reports, subcontracting, liability | In-house calibration |
| Calibration | Mandatory verification/interval/traceability | Instruments, standards, certificates | Third-party testing procurement |
| Quality-system certificate | ISO/IATF/13485 display | Scope, site, validity | Product test report |
| Supplier audit | How to run a second-party audit | Plan, sampling, findings | Third-party certification |
| Customer inspection | Hosting customer/third-party inspection | Booking, sampling, decision | Type test/certification |
| Service procurement/outsourcing | SOW/SLA/pricing/exit | Scope, acceptance, payment | TIC professional qualification |
Page relationships are editorial; the certificates, accreditation scope, contracts and regulator's determination control.
Which TIC service is being bought, and which qualification applies?
Classify first: testing (measuring sample/product items against a standard), inspection (checking a batch/goods/works/equipment for conformity), certification (product/service/system conformity assessment) and calibration (traceability of measuring equipment to standards). Qualifications differ: a body issuing test/inspection data or results with probative effect, within the scope where laws or administrative regulations require qualification accreditation, needs CMA; CNAS accreditation is a voluntary competence accreditation, not an administrative licence; a certification body must be approved by the State Council's certification and accreditation regulator and act within the approved scope; calibration capability is evidenced by CNAS accreditation scope, measurement standards and traceability, with mandatory verification governed separately. The procurement file should make the supplier fill in "service type—qualification type—certificate number—scope—validity—site" item by item, not just attach a certificate cover.
Acceptance checks: service type; qualification type; certificate number; scope; validity; site/branch; approval/accreditation scope; project mapping. Common gaps: CMA/CNAS confused; expired certificate; scope not covering the project; wrong site; unapproved certification body; no calibration traceability.
| Service | Qualification/approval | Deliverable | Verification focus |
|---|---|---|---|
| Testing | CMA (statutory scope) | Test report | Scope/method/sample/CMA mark |
| Inspection | Inspection body approval/accreditation (as applicable) | Inspection report/certificate | Approved scope/basis/site records |
| Product certification | Certification-body approval | Certificate | Approved scope/rules/factory inspection |
| System certification | Certification-body approval | ISO/IATF/13485 certificate | Accreditation/scope/site/validity |
| Calibration | CNAS accreditation (voluntary)/standards | Calibration certificate | Scope/traceability/uncertainty |
Qualification types are editorial; the law, administrative regulations, certificates and approval/accreditation scope control.
How should qualification, scope and status be verified?
At minimum verify: certificate name/number, issuing authority, body name and address, scope (items/parameters/standards/methods), validity, status, branch site and CMA mark format; for certification bodies check the approval document and approved business scope; for CNAS check the accreditation scope and status; then check the issuing/regulator website or public register, not only the supplier's PDF. Note: a qualification certificate or mark may not be transferred, rented or lent, forged, altered or misused, and an expired, revoked or cancelled certificate/mark may not be used; issuing a report outside the accredited scope is penalised. Procurement should make "certificate + scope page + query screenshot/number" part of onboarding and track expiry, scope extension and suspension/withdrawal during the contract.
Acceptance checks: certificate number; body name/address; scope; project mapping; validity; status; branch; query record; expiry alert. Common gaps: cover only; scope mismatch; expired; borrowed/affiliated qualification; unqualified branch; no status tracking.
| Check | What to write | Evidence | Common gap |
|---|---|---|---|
| Certificate | Name/number/issuer | Certificate | Cover only |
| Body | Name/address/legal entity | Business licence | Borrowed qualification |
| Scope | Items/parameters/standards/methods | Scope annex | Scope mismatch |
| Validity | Start/end/expiry alert | Certificate | Expired unnoticed |
| Status | Valid/suspended/revoked/cancelled | Register query | No status check |
| Site/branch | Actual testing site | Certificate/address | Unqualified branch |
| Approval/accreditation | Certification approval/CNAS scope | Approval document | Out-of-scope certification |
| Mark | CMA/accreditation mark use | Sample report | Mark misuse |
Verification methods are editorial; the issuing/regulator website, certificates and approval/accreditation scope control.
How should samples, methods, data and witnessing be accepted?
Key rule: where a body tests a client-submitted sample, the report is responsible for the conformity of the tested items, while the representativeness and authenticity of the submitted sample are the client's responsibility. Procurement should therefore specify: who samples, the sampling plan/base, sample numbering and sealing, handover records, transport/storage conditions, sample preparation and retention, return/disposal of the remainder; method/standard and version, sampling standard, deviations and written confirmation; whether witnessing/on-site/remote witnessing is required; ownership and traceability of raw data, spectra, photos and electronic records. A supplier-submitted sample cannot represent the whole batch unless the sampling plan supports it; for destructive tests, agree sample quantity and replacement samples. Method changes/standard revisions require re-confirmation; an old report cannot cover a new requirement.
Acceptance checks: sampling plan; sample number/seal; handover/storage; method version; deviation confirmation; witnessing; raw data; replacement/retained samples; batch representativeness. Common gaps: no sample number; supplier sample treated as the batch; outdated method; deviation not confirmed; report only; no replacement for destructive tests.
| Step | What to write | Evidence | Common gap |
|---|---|---|---|
| Sampling plan | Base/method/ratio/random | Plan | No plan |
| Sample ID | Number/seal/photo | Handover form | No number |
| Handover/storage | Time/conditions/signature | Record | Conditions breached |
| Method/standard | Standard/version/clause | Method list | Outdated version |
| Deviation | Item/impact/confirmation | Written confirmation | Not confirmed |
| Witnessing | On-site/remote/photo | Witness record | No witness |
| Raw data | Spectra/records/electronic data | Raw record | Report only |
| Retained/replacement | Period/quantity/disposal | Record | No replacement |
Sample and method requirements are editorial; standards, contracts and regulatory requirements control, and sample representativeness is the client's responsibility.
How should reports and certificates be accepted?
A report should be checked for: body name/address matching the qualification; report number/pages/issue date; testing basis (standard/version); sample number/name/condition; results/conclusion; official seal or testing seal; authorised signatory acting within technical scope; CMA mark where data/results with probative effect are issued to society; subcontract items and bodies disclosed; corrections marked as required; consistency with raw records; and verification with the body or regulator platform where needed. For a certificate, check the certification body's approved scope, certification basis/rules, certificate scope/site, validity, accreditation mark and suspension/revocation status. Do not treat a certificate as a test report, or CNAS accreditation as CMA qualification. Expired, out-of-scope, unsigned/unsealed, no standard basis and undisclosed subcontracting are red flags.
Acceptance checks: body information; report number; standard basis; sample information; result/conclusion; seal; authorised signatory; CMA mark; subcontract disclosure; correction; query; validity. Common gaps: no CMA; no signature; missing standard; subcontract not disclosed; report/sample mismatch; expired.
| Element | What to write | Evidence | Common gap |
|---|---|---|---|
| Body | Name/address/qualification match | Report/certificate | Entity mismatch |
| Report number | Number/pages/issue date | Report | No number |
| Standard basis | Standard/version/clause | Report | Missing basis |
| Sample | Number/name/condition | Report | Sample mismatch |
| Result/conclusion | Item/limit/decision | Report | Overstated conclusion |
| Seal/signature | Seal/authorised signatory | Report | No signature |
| CMA/accreditation | Mark/certificate number | Report | Mark missing |
| Subcontract/correction | Item/body/correction mark | Report | Not disclosed |
| Query/validity | Register query/certificate validity | Query record | No query |
Report elements are editorial; the Supervision Measures, Qualification Accreditation Measures and the report itself control.
How should contract, price, turnaround and liability be accepted?
The contract should state: service scope/items/parameters/standards/methods; deliverables (report/certificate/raw data/photos); turnaround/start point/expediting; sample quantity/replacement/return/disposal; subcontracting (permitted or not, prior written consent, disclosure in the report); confidentiality and data ownership (customer information, drawings, formulations, processes); liability (re-test, refund, indemnity for wrong/late/out-of-scope reports or lapsed qualification); re-test/re-inspection/arbitration testing; change/cancellation/standard revision; price/tax/payment; integrity and conflicts of interest; dispute resolution. Price should be total cost, not a single line: sample count, re-test, expediting, travel, witnessing, report copies, translation/notarisation. Certification should also specify audit man-days, sites, corrective-action verification and handling after suspension/withdrawal.
Acceptance checks: scope/standard; deliverables; turnaround; samples; subcontracting; confidentiality; liability/indemnity; re-test; change; total price; certification audit arrangements. Common gaps: unit price only; no subcontracting clause; no liability; unclear re-test fees; no standard-revision handling; certification site missing.
| Term | What to write | Evidence | Common gap |
|---|---|---|---|
| Scope/standard | Items/parameters/standards/methods | Contract/annex | Vague scope |
| Deliverables | Report/certificate/raw data | List | Report only |
| Turnaround | Start/working days/expedite | Contract | No start point |
| Samples | Quantity/replacement/return/disposal | Contract | No replacement for destructive tests |
| Subcontracting | Allowed/written consent/disclosure | Contract | Default allowed |
| Confidentiality/data | Scope/period/ownership | NDA | No NDA |
| Liability | Error/delay/lapsed qualification | Contract | Unlimited or zero |
| Re-test/change | Re-test/revision/standard change | Contract | Re-test fee unclear |
| Price/total cost | Unit/sample/expedite/witness | Quotation | Unit price only |
Contract terms are editorial; the contract, qualification scope and applicable law control.
How should supplier management and KPIs be set?
At minimum: onboarding documents (business licence, qualification/approval/accreditation certificate, scope, authorised signatories, sample reports, confidentiality/integrity undertakings); an approved-supplier list built as a "service type + item/parameter + site" matrix, not one label per body; annual review of certificate status/scope/expiry; performance on on-time report rate, report error/rework rate, re-test rate, complaints/customer-audit findings, price/total cost and responsiveness; a backup body for critical projects and capability comparison; subcontractors brought into management; anomalies (suspension/withdrawal, falsified reports, untraceable data) triggering hold/exit. Procurement, quality and R&D/regulatory should evaluate together, not on price alone.
Acceptance checks: onboarding; scope matrix; annual review; KPIs; backup; subcontractor management; anomaly handling; cross-functional review. Common gaps: certificate on file only; no matrix; no review; price only; no backup; uncontrolled subcontracting.
| Item | What to write | Evidence | Common gap |
|---|---|---|---|
| Onboarding | Licence/qualification/scope/samples/undertakings | File | Certificate only |
| Scope matrix | Service/item/parameter/site | Matrix | One label per body |
| Annual review | Status/scope/expiry | Query record | No review |
| Performance | On-time/error/re-test/complaint | Report | Price only |
| Backup | Second body/comparison for critical items | List | No backup |
| Subcontractors | Brought into management | List | Uncontrolled |
| Anomaly/exit | Suspension/withdrawal/falsification/exit | Record | No action |
Supplier-management methods are editorial; company policies, qualification scope and contracts control.
How should the website page be written, and what must not be published?
Suggested sections: (1) service types and use cases; (2) qualification/approval/accreditation types and verification; (3) sample/method/witnessing requirements; (4) report/certificate elements; (5) subcontracting/confidentiality/liability/re-test; (6) supplier management and KPIs; (7) contact window and update date. The public page explains "service types, qualification verification, sample and report requirements, liability boundary" and does not publish customer names/drawings/formulations/processes, specific report numbers/test data, undisclosed certification findings, prices or contract terms. The English page should use consistent terms (testing, inspection, certification, calibration, accreditation, scope of accreditation, sample, test report, certificate, subcontracting) and state the cut-off date. Do not describe CNAS accreditation as a mandatory state qualification, or a certificate as a test report.
The page should let procurement/quality/R&D/regulatory judge "which service, whether the qualification covers it, whether the sample and report are usable, and how liability is allocated", without exposing customer or test data. Without qualification/scope evidence, do not write "authoritative/officially designated/100% pass".
Go-live acceptance checklist
Ten checks: service classification; qualification type; certificate/scope/validity/site; sample and sampling; method/standard version; report/certificate elements; subcontracting/confidentiality/liability; price/turnaround/re-test; supplier management and KPIs; public boundary. Each needs evidence and a review date. The pass standard is not "a certificate exists", but that procurement/quality/R&D/regulatory can judge whether the scope covers the project, the sample is representative, the report will be accepted by customers/regulators, and liability is recoverable.
Before go-live, run a tabletop exercise on a real (redacted) project: need → service type → body qualification/scope → sampling → method → report → subcontracting → dispute/re-test, simulating "scope does not cover", "report without authorised signatory", "subcontracting not disclosed" and "standard revision", to see whether the page and process work.
| Check | Pass standard | Evidence | If failed |
|---|---|---|---|
| Service classification | Testing/inspection/certification/calibration clear | Requirement | Add classification |
| Qualification type | CMA/CNAS/approval matched | Certificate/approval | Add qualification |
| Scope/validity | Item/parameter/site/status | Scope annex/query | Change body |
| Sample/sampling | Plan/number/handover/representative | Record | Add plan |
| Method/standard | Standard/version/deviation | Method list | Update method |
| Report/certificate | Seal/signatory/CMA/basis | Sample report | Reject/rework |
| Subcontract/confidentiality | Prior consent/disclosure/NDA | Contract | Add clause |
| Liability/re-test | Error/delay/indemnity/re-test | Contract | Add liability |
| Supplier management | Matrix/review/KPI/backup | Register | Add management |
| Public boundary | No customers/data/prices | Page | Take down |
The acceptance list is editorial; company policies, qualification scope and contracts control.
Who should read it, who should not, and what decisions does it support?
For procurement, quality, R&D, regulatory, EHS and website teams at equipment, electronics, automotive-parts, medical-device, hardware, chemical, packaging and export manufacturers in Changzhou and nearby; also for companies handling "price only, scope not covered, unsigned report, unrepresentative sample, undisclosed subcontracting, unclear liability". Not for teams without third-party testing/certification needs, or that want one page to replace a testing/certification conclusion.
Read it if: building a TIC procurement page; writing "authoritative/CNAS" only; price-only; no signature check; supplier-submitted samples; undisclosed subcontracting; no liability. Not suitable if: treating CNAS as a mandatory qualification; treating a certificate as a test report; treating a submitted sample as the batch; treating the page as a testing/certification conclusion. Supports: service classification, qualification verification, sample/method, report/certificate, subcontracting/liability, supplier management and public-boundary self-checks.
FAQ
What is the difference between the TIC page, the calibration page, the quality-system certificate page and the supplier audit page?
The TIC page answers "how to buy testing/inspection/certification/calibration, how to accept qualifications and reports"; the calibration page answers "in-house instruments, mandatory verification, calibration intervals and traceability"; the quality-system certificate page answers "how to display and verify ISO/IATF/13485 certificates"; the supplier audit page answers "how to run a second-party audit". They complement each other; the TIC page cannot be replaced by a calibration or outsourcing page.
What is the difference between CMA and CNAS? Does a report need both?
CMA is inspection and testing body qualification accreditation, an evaluation licence by the market regulator for bodies issuing data/results with probative effect, within the scope where laws or administrative regulations require it. CNAS is voluntary laboratory accreditation confirming competence and management-system conformity, not an administrative licence. Whether a report needs the CMA mark depends on whether the test falls within the qualification scope and its use; CNAS scope evidences competence but does not replace CMA. Procurement should confirm item by item, not just "we have CNAS".
Can a laboratory subcontract? What should procurement require?
Yes, under conditions: where a test item is subcontracted, the body must subcontract to a body with the corresponding conditions and capability, obtain the client's prior consent to the subcontracted item and the proposed subcontractor, and state the subcontracted item and body in the report. The contract should state whether subcontracting is allowed, require prior written consent, verify the subcontractor's qualification and report disclosure, and keep the main body liable; do not allow it by default or accept a report that does not disclose it.
Who is responsible for the representativeness of a submitted sample?
Where a body tests a client-submitted sample, the report is responsible for the conformity of the tested items, while the representativeness and authenticity of the sample are the client's responsibility. Procurement should sample, seal, number, hand over and store according to a sampling plan (directly or through a third party). Using a supplier-submitted sample to represent a whole batch requires a supporting sampling plan and evidence; otherwise the report proves only the sample, not the batch.
What elements must a report/certificate have to be accepted?
A report should have: body name/address matching the qualification, report number/pages/issue date, standard basis, sample information, results/conclusion, official or testing seal, an authorised signatory acting within scope, the CMA mark where applicable, subcontracted items/bodies disclosed, and corrections marked. A certificate should be checked for the certification body's approved scope, certification basis, certificate scope/site, validity and status. It should also be verifiable with the body or regulator platform and consistent with raw records.
How long should reports and raw records be kept?
An inspection and testing body must archive its raw records and reports for at least six years. The buyer should also keep reports, sampling records, handover forms and query records as required by contract/customer/regulation; for customer audits, regulator checks and quality disputes, six years is the minimum, not the whole of the company's archive obligation.
Should the website publish the laboratory, report numbers and test data?
Usually not customer names/drawings/formulations/processes, specific report numbers/test data, undisclosed certification findings, prices or contract terms; it can publish service types, qualification verification methods, sample/report requirements, subcontracting/confidentiality/liability boundaries and the update date. The goal is to let customers understand the procurement and acceptance method, not to disclose customer information and test data.
One-sentence takeaway
The TIC procurement page on a Changzhou manufacturer's website is not "find a lab and compare prices"; it is about turning service classification, CMA/CNAS/certification approval, certificate scope/validity/site, sample representativeness and sampling, method/standard, report/certificate elements, subcontracting/confidentiality/liability, re-test and supplier management into a checkable list, so procurement/quality/R&D/regulatory can judge whether the qualification covers the project, whether the sample is representative, whether the report will be accepted and whether liability is recoverable.
Research method and limitations
This article is a summary of public rules and page method, not testing/certification/legal advice. It uses no unpublished customer names/drawings/formulations/processes, specific report numbers/test data, certification findings, prices or contracts; the tables and acceptance items are editorial and not testing/certification conclusions. The Inspection and Testing Body Qualification Accreditation Measures, the Inspection and Testing Body Supervision and Administration Measures, the Certification and Accreditation Regulations, CNAS-RL01 and MOF Internal Control Application Guideline No. 7 (Procurement) are public sources; the certificates, approval/accreditation scope, contracts and regulator's determination control. This article does not decide whether any specific body/report is compliant, and does not promise "100% pass/customer acceptance"; companies should confirm item by item based on the project, use and customer requirements.
Sources and basis
Current to 2026-11-11; the official pages below control.
- Inspection and Testing Body Qualification Accreditation Measures (AQSIQ Order No. 163, amended 2021): State Administration for Market Regulation. CMA certificate, scope, CMA mark on reports, prohibition on transfer/lending, out-of-scope penalties; used for qualification verification.
- Inspection and Testing Body Supervision and Administration Measures (SAMR Order No. 39, amended by Order No. 101 of 2025): State Administration for Market Regulation. Client responsibility for submitted samples, subcontract consent/disclosure, report seal/authorised signatory, six-year retention, untrue/false reports; used for sample, report and liability acceptance.
- Certification and Accreditation Regulations of the PRC (third revision, 2023): National Administrative Regulations Database (Ministry of Justice). Certification-body approval/scope, personnel practice, conflicts of interest, liability for false certification; used for certification acceptance.
- CNAS-RL01:2025 Rules for the Accreditation of Laboratories: China National Accreditation Service for Conformity Assessment. Voluntary application, accreditation conditions/scope/status, accreditation marks; used for CNAS verification.
- MOF Internal Control Application Guideline No. 7 — Procurement (Cai Kuai [2010] No. 11): Linyi Finance Bureau. Supplier selection, contracts, acceptance, payment and records; used for onboarding, contract and acceptance controls.