Direct answer: Raw-material price adjustment is not the phrase "follow the market". It is a reviewable rule built from a base price, index, formula, trigger, observation window, effective date, evidence and dispute process. If a Changzhou manufacturer's website says "prices may be adjusted for raw-material increases / quote validity / index-linked pricing", the page should state: which index (LME, SHFE, National Bureau of Statistics, or a customer-accepted third-party index), what specification/unit/currency/tax basis it covers, how material consumption and base price are set, what change triggers an adjustment, which day's data is used, when it takes effect, whether there is a cap, whether decreases are passed through, who calculates and approves, and what happens if the customer disagrees. Otherwise, "use one price when it rises and ignore it when it falls" will end in a dispute between procurement, sales, finance and the customer. Information is current to 2026-11-05. This is a review of public rules and project practice, not legal, tax, financial or pricing advice; specific formulas, index licensing, contract clauses and disputes depend on the contract, applicable law, exchange/NBS rules and professional advice.
This guide is for equipment, electronics/electrical, automotive, medical device, hardware/tools, metalworking, cable/connector, chemical, packaging and export manufacturers in Changzhou and nearby areas. It explains how to write and accept a raw-material price index-linked adjustment page. Commodity price swings are normal commercial risk; not every increase qualifies as a "change of circumstances". The page and contract should first make the commercial mechanism clear, then discuss legal fallbacks.
Price adjustment = index + formula + trigger + evidence, not "follow the market". State the specification, unit, currency, tax basis and date; LME, SHFE and NBS use different bases and cannot be mixed. Raw-material increases are usually commercial risk and do not automatically qualify as a change of circumstances; write the mechanism into the contract instead of arguing after a price move.
How does the price-adjustment page relate to product price, quotation, order change and payment pages?
The product price page answers "how to display list/range/starting prices"; the quotation page answers "what price for this order, how long it is valid, how the offer is confirmed"; the order change page answers "how to change quantity/lead time/specification after ordering"; the payment terms page answers "how and when to settle"; the force majeure page answers "notice/evidence/mitigation when performance is impossible". The price-adjustment page only answers "when the raw-material index changes, by what rule does the price adjust". It does not replace quotation, order change, payment or force majeure, and it does not turn normal market movements into force majeure.
Common breakpoints: the website says only "prices follow raw materials" without an index/formula; sales says "we'll discuss later"; the purchase contract says "follow the market" and finance cannot verify; the customer wants a fixed price while the supplier keeps a unilateral right to increase; LME copper is applied to an aluminium part; a tax-inclusive price is subtracted from a tax-exclusive index; decreases are ignored while increases are applied; "change of circumstances" is treated as an automatic adjustment button. A page that states the boundaries gives procurement, sales, finance, legal and the customer one playbook.
| Page | Answers | Key fields | Cannot replace |
|---|---|---|---|
| Product price | How list/range/starting prices are shown | Price, tax, validity, conditions | Long-term adjustment formula |
| Quotation | Price for this order and validity | Unit price, validity, currency, Incoterms | Raw-material index mechanism |
| Order change | Change/cancel/expedite after ordering | Window, fees, written confirmation | Price-adjustment formula |
| Payment terms | Credit, settlement, invoice | Credit period, currency, milestones | Price-adjustment trigger |
| Force majeure | Notice/evidence/mitigation when unable to perform | Event, notice, evidence, mitigation | Normal market movement |
| Price adjustment | How price changes with the index | Index, formula, trigger, effective date, evidence | Quotation/change/settlement itself |
This page map is editorial; price clauses, force majeure and change of circumstances follow the contract and applicable law (including the Civil Code), not this article.
What adjustment mechanisms are common?
At least five: (1) fixed price + quote validity: no adjustment within validity, re-quote after expiry; (2) index-linked: automatic/semi-automatic adjustment under an agreed index and formula; (3) periodic review: monthly/quarterly index review, negotiated or formula-based adjustment; (4) cost-plus/open book: material, labour and overhead itemised; (5) cap/collar: adjustment only beyond a band, or a cap per adjustment. The choice depends on material share, customer type, contract length, index transparency and bargaining power. Short small orders fit fixed price + validity; long-term contracts for metal parts, cable and packaging fit index linkage or periodic review.
Acceptance checks: mechanism name; applicable products/customers; validity; trigger; who calculates; who approves; customer acceptance; two-way or one-way; cap. Common gaps: only "negotiable" with no trigger; a long-term contract with a fixed price but no validity; index linkage that only adjusts upward; cost-plus without a cost basis/audit right; a cap written as a vague percentage.
| Mechanism | How it works | Fit/evidence | Common gap |
|---|---|---|---|
| Fixed price + validity | No change within validity; re-quote after | Short orders/standard parts; quotation | No validity |
| Index-linked | Adjust by index/formula | Metals/cable/packaging; index records | Only upward |
| Periodic review | Monthly/quarterly review and negotiation | Long contracts; minutes | No trigger rule |
| Cost-plus | Material/labour/overhead itemised | Custom/project; cost sheet | Opaque basis |
| Cap/collar | Adjust only beyond a band/cap | Risk sharing; clause | "Reasonable" only |
Mechanism selection is editorial; specific prices, adjustment ranges and contract clauses follow company policy, customer contract and applicable law.
LME, SHFE or NBS? How should the index be chosen?
Start with the material and market: copper, aluminium, zinc and nickel often use LME or the Shanghai Futures Exchange (SHFE); domestic steel, chemicals, energy and building materials may use the National Bureau of Statistics (NBS) market prices of important production materials; customers/industries may specify a third-party index. The bases differ: the LME Official Settlement Price is normally the cash seller's price (cash seller's offer), the LME also publishes a 3-month price, in USD/tonne, subject to LME data licensing/use terms; the SHFE daily settlement price is the volume-weighted average of that contract's trades that day, in CNY/tonne, and is not the closing price; the NBS circulation-market price is a wholesale/sale price that includes circulation costs, profit and taxes—different from an ex-factory price—published roughly every ten days for 9 categories and 50 products. The contract must state which index, which date, which price type (official/closing/settlement/spot), specification and unit.
Acceptance checks: index name/publisher; metal/grade/specification; unit (tonne/kg/lb); currency; tax-inclusive/exclusive; official/closing/settlement/spot; observation date; data licence; fallback index. Common gaps: only "market price"; LME copper applied to an aluminium part; SHFE settlement and closing mixed; NBS circulation price treated as ex-factory; a USD index subtracted directly from a CNY selling price; no fallback if the index stops or is revised.
| Index | Basis/use | What to state | Common gap |
|---|---|---|---|
| LME | Global non-ferrous benchmark; cash/3M | Official/closing, date, USD/tonne, licence | 3M treated as cash |
| SHFE | Domestic futures; settlement/closing | Contract, settlement/closing, CNY/tonne | Settlement treated as closing |
| NBS | Circulation market, 9 categories/50 products; ~10 days | Product spec, wholesale price, tax basis | Treated as ex-factory/spot |
| Third-party/industry | Customer-specified/industry practice | Method, licence, fallback | Opaque source |
| Custom basket | Weighted multiple materials | Weights, base period, update rule | Weights undisclosed |
Index bases are editorial; LME/SHFE/NBS official pages and the contract control, and data use follows each institution's licensing terms.
How should the formula and material consumption be written?
Two common forms: (1) absolute amount: P = P0 + Q × (I − I0), where P0 is the base price, Q is material consumption per unit (tonnes/unit), and I0/I are the base/current index; (2) percentage: P = P0 × [1 + α × (I/I0 − 1)], where α is the material cost share of the selling price. Absolute amount suits metal parts/cable with measurable consumption; percentage suits long-term contracts with a stable material share and customer acceptance. Either way, state the source of Q/α, tax-inclusive/exclusive basis, currency, loss/recycled material, minimum increment and rounding. Example (hypothetical, not a quote): Q=30 kg/unit, I0=70,000 CNY/tonne, I=77,000 CNY/tonne, so the adjustment is 0.03×(77,000−70,000)=CNY 210/unit; with α=30%, the percentage method gives 30%×(77,000/70,000−1)=3%.
Acceptance checks: base price P0; base index I0; consumption Q or share α; formula; tax basis; currency; loss/recycling; minimum increment; worked example; approval. Common gaps: words without variables; Q based on theoretical weight vs actual issue unclear; α blends all materials into one ratio; a tax-inclusive price multiplied by a tax-exclusive index; no currency clause; rounding that does not reconcile; a current-price example treated as a commitment.
| Variable | Meaning/how to write | Evidence | Common gap |
|---|---|---|---|
| P0 | Base price, currency, tax basis | Quotation/contract | Basis unclear |
| I0 / I | Base/current index, date, source | Official record | Wrong date |
| Q | Consumption (tonnes/unit, kg/unit) | BOM/issue records | Theoretical/actual mixed |
| α | Material share of selling price | Cost sheet | Guesswork |
| Formula | Absolute/percentage, rounding | Contract/calculation | Words only |
| Tax/FX | Tax-inclusive/exclusive, FX base | Finance records | Mixed calculation |
| Example | Mark "hypothetical/not a quote" | Calculation | Treated as commitment |
Formulas/examples are editorial; specific variables, tax, FX and rounding follow the contract, finance and tax basis.
How should trigger, observation window and effective date be set?
Answer six questions: (1) what change triggers (±3%, ±5%, or only the excess); (2) which window (monthly average, quarterly average, ten-day price, a specified trading day); (3) which day's data (publication date, last trading day, order date, shipment date); (4) when it takes effect (next month, next order, shipment date, or retroactive); (5) whether it is two-way (both increases and decreases, or only increases); (6) whether there is a cap/collar/dead band. A small trigger causes frequent adjustments and admin cost; a large one shifts too much risk. Write "adjust only when the change exceeds X%, calculated on the excess (or the full change)" and state that it is not retroactive. If the index is missing/suspended during the window, have a fallback (previous period, backup index, negotiation).
Acceptance checks: threshold; window; data date; effective date; direction; cap/collar; dead band; notice period; missing-data rule. Common gaps: "adjustable if the increase exceeds 5%" without a base/window; a monthly average clause but a single-day price used; "effective anytime"; only upward; every adjustment retroactive to shipped goods; the index stops and the contract freezes; no notice period.
| Element | Options | Evidence | Common gap |
|---|---|---|---|
| Trigger | ±3%/±5%; excess only | Contract/calculation | Base unclear |
| Window | Monthly/quarterly/ten-day/specified day | Index records | Single day as average |
| Data date | Publication/last trading/order date | Page/receipt | Wrong date |
| Effective date | Next month/next order/shipment | Notice/order | "Anytime"/retroactive |
| Direction | Two-way/one-way | Contract | Only upward |
| Cap/collar | Per-adjustment/cumulative cap; band | Clause | "Reasonable" |
| Fallback | Previous period/backup index/negotiation | Clause | None |
Triggers/windows/effective dates are editorial; the mechanism follows the contract, customer and finance, and should avoid retroactivity and unilateral interpretation.
How should index data be evidenced?
Keep at least five records for each adjustment: (1) the index source page/official PDF (publisher, title, date); (2) a screenshot/timestamp/archived link; (3) a calculation sheet (P0, I0, I, Q/α, formula, tax, FX, result); (4) approval records (who calculated, reviewed, approved); (5) notice/customer confirmation (email, stamped price-adjustment letter, order change). For LME/SHFE data, confirm data use/redistribution rights; do not scrape real-time quotes and publish them. If an index is revised/suspended, keep the original version and the fallback record. In a dispute, an evidence chain beats "I remember the price at the time".
Acceptance checks: source; date; calculation; approval; notice; version; licence; retention. Common gaps: one screenshot with no date; a third-party repost; the calculation sheet not matching the contract formula; approval after the fact; invoicing at the new price without customer confirmation; overwriting the old version; unclear data licence.
| Evidence | What it contains | How to keep | Common gap |
|---|---|---|---|
| Index source | Institution/title/date/value | PDF/archive | Repost/no date |
| Screenshot | URL/timestamp/full page | Controlled folder | Cropped/no time |
| Calculation | Variables/formula/tax/FX | Versioned sheet | No working paper |
| Approval | Calculation/review/approval | OA/email | After the fact |
| Notice | Recipient/amount/effective date | Email/stamped letter | Verbal |
| Licence | Data use/redistribution permission | Licence record | Public repost |
The evidence list is editorial; data use/redistribution follows LME/SHFE/NBS terms, and specific licensing should be confirmed with the institution/legal counsel.
What clauses should the contract contain?
At least: (1) index definition (institution, product, specification, unit, currency, tax basis, official/closing/settlement/spot); (2) formula and variables (P0, I0, Q/α, rounding); (3) trigger/window/data date/effective date; (4) cap/collar/dead band; (5) notice period and method; (6) whether tax/FX/freight/packaging adjust; (7) fallback (suspension/revision/substitute); (8) dispute resolution and evidence; (9) termination/long-term no-adjustment treatment; (10) data confidentiality and licensing. The price clause must match the quotation, order, invoice and website; do not use "follow the market" or "to be negotiated" instead of a formula.
Acceptance checks: index definition; formula; trigger; effective date; cap; notice; tax/FX; fallback; dispute; termination; consistency. Common gaps: the contract says "market price" without definition; formula differs from the quotation; only increases; no notice period; no cap; the index stops and the clause cannot operate; no calculation working paper in a dispute; invoice price differs from the contract price.
| Clause | What to write | Evidence | Common gap |
|---|---|---|---|
| Index definition | Institution/spec/unit/currency/tax | Contract | "Market price" |
| Formula | Variables/rounding | Annex | Words only |
| Trigger/effective | Threshold/window/date | Clause | Anytime/retroactive |
| Cap/collar | Per-adjustment/cumulative cap | Clause | "Reasonable" |
| Notice | Period/method/contact | Email/letter | Verbal |
| Tax/FX | Tax basis/FX reference | Finance | Mixed |
| Fallback | Suspension/revision/substitute | Clause | None |
| Dispute/termination | Evidence/jurisdiction/exit | Clause | None |
Contract clauses are editorial; specific terms, governing law and dispute resolution follow the contract and legal/finance/tax advice.
How should the website price-adjustment page be written?
A public page should state: (1) applicable products/customers/contract types; (2) mechanism (fixed price + validity/index-linked/periodic review); (3) index source and basis (do not publish unauthorised real-time quotes); (4) a written explanation of the formula and a "hypothetical example"; (5) trigger/window/effective date/notice; (6) which costs do not adjust with the index (processing, freight, packaging, certification); (7) how customers can enquire/request/dispute; (8) version/update date/contact. Mark the example "hypothetical, not a quote"; do not use today's price as a commitment; do not publish customer-specific formulas, discounts or contract prices. The page's job is to explain "what the rule is, how it is calculated, whom to contact", not to replace a quotation.
Separate "public rules" from "customer contract": the public page explains the general mechanism; the specific base price, Q/α, cap, payment and delivery follow the contract/quotation. Multilingual pages should use consistent terms (index, settlement price, base price, trigger, cap/collar) and state currency/tax/unit. If a customer wants a fixed price, the page can say "fixed price applies within the quote validity; re-quote after expiry"—do not imply every customer can adjust at will.
| Section | What to write | Evidence | Avoid |
|---|---|---|---|
| Scope | Products/customers/contract types | Contract/quotation | "All customers" |
| Mechanism | Fixed/index/review | Clause | "Follow the market" |
| Index | Institution/spec/unit/tax | Official page | Unauthorised quotes |
| Formula | Variables/example | Calculation | Today's price as promise |
| Trigger/effective | Threshold/window/date | Clause | Anytime/retroactive |
| Non-adjusting costs | Processing/freight/packaging/certification | Quotation | Blended calculation |
| Dispute/contact | Entry/owner/version | Form | No entry |
This page structure is editorial; external statements must be truthful and verifiable, and specific prices/formulas follow the contract/quotation—not a quote or commitment.
How should internal governance be split?
Suggested split: procurement/sales raises the need; finance/costing provides P0, Q/α, tax/FX; a data administrator obtains and archives the index; a price committee/authorised person approves; contract/legal reviews clauses; customer service/sales notifies the customer; internal audit samples. Each adjustment needs a calculation, approval, notice, customer confirmation and archive; do not let one person obtain the data, calculate, notify and collect payment. Set authority by amount/percentage; have an escalation path for anomalies (index jump, customer complaint, missing data). Review annually whether the mechanism still fits; changes to formula/index require a contract amendment.
Acceptance checks: roles; authority; calculation/review separation; approval levels; notice; archive; escalation; annual review. Common gaps: verbal sales promises; finance does not know the formula; procurement obtains data without records; one owner decides; invoicing without customer confirmation; no contingency; no review for years.
| Role | Responsibility | Evidence | Common gap |
|---|---|---|---|
| Procurement/sales | Need, customer communication, contract | Email/contract | Verbal promise |
| Finance/costing | P0, Q/α, tax/FX | Cost sheet | Unclear basis |
| Data administrator | Obtain/archive index | Page/screenshot | No record |
| Price approver | Approve by authority | OA/minutes | One-person decision |
| Legal/contract | Clauses/disputes | Contract | Missing clauses |
| Internal audit | Sample/review | Report | No review |
The split is editorial; specific authority, approval and responsibilities follow company policy.
What are the most common disputes?
Six common types: (1) which index/which date (LME official vs closing, SHFE settlement vs closing, NBS early vs late ten days); (2) tax-inclusive/exclusive and currency/FX (USD index vs CNY selling price); (3) consumption/loss/recycling (theoretical weight vs actual issue, scrap/recycled material); (4) only upward/one-way adjustment; (5) retroactivity (new price applied to shipped/invoiced orders); (6) treating normal price movement as force majeure/change of circumstances. Solve with contract definitions + evidence + notice + customer confirmation, not after-the-fact explanations. In a dispute, first check the contract formula and data date, then the calculation/approval/notice; without them, it is hard to convince the customer or an arbitral tribunal.
Acceptance checks: dispute types; corresponding clauses; evidence; handling deadline; escalation; case review. Common gaps: no contract definition; unclear data date; no calculation sheet; no customer confirmation; sales makes promises; no escalation; no review.
| Dispute | Typical cause | How to avoid | Evidence |
|---|---|---|---|
| Index/date | Inconsistent basis | Contract states institution/date/price type | Clause/records |
| Tax/FX | Tax/currency mixed | Unified tax/FX basis | Finance records |
| Consumption/loss | Theoretical/actual mixed | BOM/issue basis | BOM/issue |
| Only upward | One-way clause | Two-way/cap | Contract |
| Retroactivity | Unclear effective date | State non-retroactive | Notice/order |
| Force majeure | Market movement treated as force majeure | Distinguish commercial risk | Contract/law |
Dispute types are editorial; specific determinations follow the contract, evidence and applicable law—not this article.
What must not be written?
High-risk claims: "prices follow the market" (no formula/index); "subject to our notice" (unilateral); "only upward/no cap"; "at the highest/lowest market price" (undefined); "state-set price" (most goods are market-adjusted); "raw-material increases are a change of circumstances, so we adjust automatically" (the threshold is high and commercial risk is usually excluded); "all customers use the same formula" (contracts may differ); "index data can be reposted freely" (licensing may apply); "quote valid indefinitely" (no validity/conditions). These are either unworkable or misstate commercial/legal responsibility.
Safer wording: "adjust according to the LME/SHFE/NBS index and formula in the contract; trigger ±X%, window Y, effective Z; two-way/capped; subject to written notice and calculation sheet; specifics follow the contract and applicable law." External promotion must also comply with the Price Law's clear-pricing/truthfulness requirements; do not add unmarked charges outside the displayed price. Customer/supplier data needs authorisation/redaction.
| Wording | Problem | Suggested wording | Basis |
|---|---|---|---|
| "Follow the market" | No formula/index | Institution/formula/trigger | Contract |
| "Subject to our notice" | Unilateral | Mutual confirmation/objection period | Contract |
| "Only upward" | Unfair/dispute | Two-way/cap | Fairness |
| "State-set price" | Most are market-adjusted | Market/contract price | Price Law |
| "Increase = change of circumstances" | High threshold/commercial risk | Contract mechanism | Civil Code |
| "Repost any index" | Licensing risk | Confirm licence/citation | Data terms |
| "Valid indefinitely" | No validity | Validity/re-quote | Quotation rules |
These red lines are editorial; whether a statement is illegal/breaching a contract is determined by regulators, courts/arbitration and the contract—not this article.
Go-live acceptance checklist
Ten checks: scope/mechanism, index definition, formula/consumption, trigger/window/effective date, cap/two-way, evidence/licence, contract clauses, website wording, internal approval, dispute handling. Each needs an owner, evidence and review date. The pass condition is not "the page says adjustable", but that the customer can recalculate the same number from the page/contract, and sales/finance/procurement can explain it with the same evidence.
Before go-live, run one real product through: choose index → obtain data → apply formula → calculate adjustment → approve → notify → customer confirmation → invoice/order. Any step that fails is a gap in the page or process. Mark examples "hypothetical"; do not use today's market as a commitment.
| Check | Pass condition | Evidence | If it fails |
|---|---|---|---|
| Scope/mechanism | Products/customers/mechanism clear | Contract/page | Clarify |
| Index definition | Institution/spec/unit/tax/date | Contract | Add definition |
| Formula/consumption | Variables/example reproducible | Calculation | Add formula |
| Trigger/effective | Threshold/window/date | Clause | Add rule |
| Cap/two-way | Cap/decrease mechanism | Clause | Add clause |
| Evidence/licence | Source/screenshot/licence | Archive | Add evidence |
| Contract | Consistent with page/quotation | Contract | Align |
| Website wording | No "follow market/only upward" | Page test | Rewrite |
| Approval | Calculate/review/approve | OA | Add process |
| Dispute | Entry/deadline/evidence | Records | Add mechanism |
This checklist is editorial; specific prices, contracts and legal requirements follow company policy, the contract and professional advice.
Who should read this, who should not, and what decisions does it support?
It suits procurement, sales, finance, legal and website teams at equipment, electronics/electrical, automotive, medical device, hardware/tools, metalworking, cable/connector, chemical, packaging and export manufacturers in Changzhou and nearby areas; also suppliers being asked by customers for "price lock/adjustment/index linkage". It does not suit businesses with no raw-material exposure, one-off spot sales, or teams wanting one page to replace contract/legal/finance advice.
Read it if a customer requires a long-term contract/price linkage; raw materials are a large cost share; quote validity and price adjustments cause disputes; you are building or revising a website price page; or you need to separate fixed price, index linkage, order change and force majeure. Skip it if you use "follow the market" instead of a formula, only adjust upward, or treat commercial risk as a change of circumstances. It supports self-review of index selection, formula, trigger, evidence, contract clauses and page wording.
FAQ
Can we rely on "change of circumstances" to raise prices when raw materials rise?
Not automatically. Article 533 of the Civil Code requires a fundamental change in the contract's basis that was unforeseeable at signing, is not commercial risk, and makes performance obviously unfair; whether raw-material price movement qualifies is determined by a court/arbitration on the facts. The safer approach is to write an index-linked/adjustment mechanism into the contract in advance, rather than claim it after the price moves.
Should we use LME, SHFE or NBS?
It depends on the material, market, currency and customer acceptance: non-ferrous metals in international/export contracts often use LME (note official/closing, cash/3M, USD/tonne and data licensing); domestic futures often use SHFE (settlement/closing, contract, CNY/tonne); domestic steel/chemicals/building materials may use NBS circulation-market prices (9 categories/50 products, about every ten days, wholesale/sale prices including circulation costs/taxes). The contract must state the index, specification, unit, currency, tax basis and date.
How should the index-linked formula be written so it can be executed?
At least P0 (base price), I0/I (base/current index), Q (consumption) or α (material share), the formula, tax/FX, rounding, trigger/window/effective date. Absolute method: P=P0+Q×(I−I0); percentage method: P=P0×[1+α×(I/I0−1)]. Mark examples "hypothetical"; do not treat today's price as a commitment. The formula, quotation, contract and invoice must match.
How do quote validity and the adjustment mechanism work together?
The quotation states "validity + fixed price within validity/re-quote after expiry"; a long-term contract separately states "index linkage/periodic review". Do not write "valid indefinitely", and do not adjust within the validity period unless the contract expressly allows it. Order changes/cancellations follow the order-change page; price linkage follows the contract mechanism—do not mix them.
What if the customer disagrees with the adjustment?
First communicate under the contract and evidence: index, date, formula, calculation, notice period; check for cap/collar and review/dispute clauses. If the contract has no mechanism, first negotiate an amendment; if that fails, consider whether any statutory/contractual remedy (such as change of circumstances) applies, as determined by a court/arbitration; do not use supply stoppage/withholding to force an adjustment. For major disputes, follow the contract's dispute-resolution clause and keep all evidence. Consult a lawyer/legal counsel for specifics.
Can the website say "prices follow the market"?
Not recommended. Write "adjust according to the index/formula/trigger/effective date in the contract", state the index source, a hypothetical example, validity, notice and dispute entry; do not write "only upward/subject to our notice/state-set price/valid indefinitely". The website is a rule explanation, not a price commitment; specific prices follow the quotation/contract.
One-sentence takeaway
A Changzhou manufacturer's raw-material price-adjustment page is not about "follow the market". It should turn the index, formula, consumption, trigger, window, effective date, cap, evidence, contract and dispute process into a reproducible rule—so customer, procurement, sales and finance can calculate the same number from the same data.
Method and limitations
This is a review of public rules and project practice, not legal, tax, financial or pricing advice on any company, product, price, contract or dispute. The example prices are purely hypothetical and do not represent any company's quote or current market; no undisclosed customer, supplier or contract data were used. Index selection, formulas, triggers, risk tiering and acceptance checklist are editorial suggestions, not legal/financial conclusions. Specific index bases, data licensing, contract clauses, tax/FX and dispute handling depend on LME/SHFE/NBS rules, the contract, applicable law and professional advice.
Sources and scope
Information is current to 2026-11-05. The following are official/primary pages; their rules, data licensing and clauses control.
- London Metal Exchange, Market Data FAQs: LME. LME cash/3-month prices, official settlement vs closing prices, data licensing.
- Shanghai Futures Exchange, Settlement Rules (revised): SHFE. Daily settlement price as the volume-weighted average of the day's trades; treatment when there is no trade.
- National Bureau of Statistics, Market Prices of Important Production Materials in the Circulation Sector, late February 2026: NBS. 9 categories/50 products, 31 provinces/300+ markets/~2,000 companies, wholesale/sale price vs ex-factory price.
- Civil Code of the People's Republic of China (adopted 2020): CAC/NPC. Price terms, supplementary interpretation/market price, change of circumstances (Article 533).
- Price Law of the People's Republic of China: CAAC. Market-adjusted prices, operator pricing autonomy, internal price management, clear pricing.