Direct answer: A procurement statement of work (SOW) or technical specification is not a "parameter list"; it should make the purchase quotable, contractible and acceptable. Technical requirements cover function, quality, performance, materials, structure, appearance and safety; commercial requirements cover delivery time and place, payment, packaging and transport, after-sales service and insurance. Write clearly, objectively and quantitatively, with grades for continuous ranges. You may reference national, industry or local standards, or set higher requirements, but state the standard number, year and whether it is mandatory or recommended. Acceptance should state sampling, test methods, decision rules, reports, corrective action and re-inspection, and connect to the contract inspection period. Changes need a revision number, effective date, deviation approval and withdrawal of the old version. The website page should turn "scope, technical specification, commercial terms, standards, acceptance, deviations, changes, NDA/download" into a reviewable checklist, not just "meets national standards / customizable". Information is current to 2026-11-06. This is a review of public rules and page practice, not legal, procurement, certification or contract advice. Cai Ku [2021] No. 22 applies to government procurement projects; private procurement may borrow the method, while rights and obligations follow the Civil Code, the contract and the project documents.
This guide is for procurement, engineering, quality, regulatory and website teams at equipment, electronics/electrical, automotive, medical device, hardware, chemical, packaging and export manufacturers in Changzhou and nearby areas. SOW pages most often miss scope, quantification, standard versions, acceptance methods, deviations and changes, leaving only "customizable per drawing / meets national standards".
An SOW must be quotable, contractible and acceptable: technical and commercial requirements both. State the standard number/year and whether it is mandatory or recommended; state sampling, methods, decision rules, reports and re-inspection; state the revision, deviations and withdrawal of the old version. The website should explain scope, specification, acceptance, deviations and confidentiality—not just "meets national standards / customizable".
How does this page relate to quotation, contract/technical agreement and sourcing pages?
The SOW/technical specification page answers "what we buy, what is required, and how it is accepted"; the quotation/RFQ response page answers "how a supplier quotes and how long the quote is valid"; the contract/technical and quality agreement page answers "document priority, deviations, signatures and versions"; the supplier development/sourcing page answers "how to find suppliers, RFI/RFQ, samples, audit, trial production and award". The SOW is the front-end requirement; a quotation or contract template cannot replace it.
Common breakpoints: parameters without acceptance methods; technical requirements without commercial terms; standards cited without versions; "equal or better" instead of a decision rule; no deviation list; changes sent by chat; full drawings/costs published; "meets national standards / customizable" with no boundary. Separate "requirement—specification—acceptance—deviation—change"; then procurement, engineering, quality and suppliers share one playbook.
| Page | Answers | Key content | Cannot replace |
|---|---|---|---|
| SOW/technical specification | What we buy, requirements, acceptance | Technical/commercial requirements, standards, acceptance, deviations | Quotation/contract |
| Quotation/RFQ response | How to quote, validity | Fields, price, lead time, deviations | SOW |
| Contract/technical agreement | Priority, signature, version | Clauses, deviations, signatures, annexes | Requirement survey |
| Supplier development/sourcing | Who, how to trial | RFI/RFQ, samples, audit, trial | Specification |
| Procurement notice | Categories, access, RFQ, payment | Notice, access, process | Technical specification |
| Product specification page | Sales parameters | Model, performance, selection | Procurement SOW |
This page map is editorial; the procurement documents, contract and project confirmation control.
What makes up a procurement requirement?
Under Cai Ku [2021] No. 22, a procurement requirement is the subject matter the purchaser intends to buy and the technical and commercial requirements it must meet. Technical requirements cover the function and quality of the subject matter, including performance, materials, structure, appearance and safety, or service content and standards. Commercial requirements cover the time, place, financial and service requirements for obtaining the subject matter, including delivery/implementation time (period) and place (scope), payment terms (progress and method), packaging and transport, after-sales service and insurance. Private procurement can borrow this split, but the contract and project documents control.
The first page of an SOW should answer: what, quantity/scope, where it is used, what must be achieved, how it is proven, how it is accepted, when/where it is delivered, how it is paid, and how after-sales/spares are handled. If one item is missing, suppliers fill the gap with assumptions that later become disputes.
| Element | What to write | Evidence | Common gap |
|---|---|---|---|
| Subject/scope | Name, quantity, boundary, exclusions | BOM/list | Unclear scope |
| Function/quality | Use, performance, life, reliability | Spec/test | Parameters only |
| Material/structure | Material, dimensions, structure, appearance | Drawing/standard | Missing drawing |
| Safety/environment | Protection, certification, conditions | Standard/report | Safety omitted |
| Delivery | Time, place, batch, packaging | Plan/contract | "ASAP" |
| Payment | Progress, method, invoice, tax | Contract/finance | Unclear basis |
| After-sales | Warranty, response, spares, training | Service commitment/contract | Verbal promise |
The split follows Cai Ku [2021] No. 22; private procurement follows the contract and project documents.
How should the boundary of a requirement be set?
A procurement requirement should comply with laws and regulations, government procurement policy, national rules and mandatory national standards, follow budget, asset and financial rules, and fit the project and actual needs. Technical and commercial requirements should be objective; quantitative indicators should have grades, and continuous ranges should be divided into grades. Where a supplier must provide a design, solution or organisation plan, state the function, application scenario and objective, and make the objective, quantitative indicators as clear as possible. You may directly reference national, industry or local standards, or set higher technical requirements, but may not use a brand, model, patent or technical route to point to a specific supplier.
Boundary checks: does it point to a specific brand/supplier; are irrelevant conditions used as qualifications; is "equal or better" used instead of a decision rule; is an internal model/customer-specified part made exclusive; is the budget/maximum price written into the technical specification; is there room for equivalent alternatives? The Cai Ku [2021] No. 22 review covers non-discrimination, competition, procurement policy and performance risk.
| Requirement | How to write | Avoid | Basis |
|---|---|---|---|
| Function/quality | Use + quantitative indicator + grade | "High quality" | No. 22 |
| Standard | Number + year + title | "Meets national standard" | Standardization Law |
| Brand | Performance/interface equivalence, no brand | Single brand | No. 22 |
| Qualification | Directly related to performance | Irrelevant threshold | No. 22 |
| Range | Divide into grades | "Bigger is better" | No. 22 |
| Alternative | Allow equivalent + proof method | "Equal or better" | Editorial |
| Budget | Internal budget/maximum price separately | In the technical spec | No. 22 |
Boundary follows Cai Ku [2021] No. 22; the procurement documents and contract control the project.
When and how should a requirement survey be done?
Before setting the requirement, a purchaser may use consultation, expert argument or a questionnaire to understand the industry, market supply, historical awards for similar projects, and possible follow-on procurement such as operation and maintenance, upgrades, spare parts and consumables; for a market survey, the respondents should generally be no fewer than three and representative. A requirement survey should be conducted for: goods or services of RMB 10 million or more, works of RMB 30 million or more; projects with public interest or high social attention; technically complex or highly specialised projects (including custom IT systems and imported products); and other projects the supervising budget unit or purchaser considers necessary. The survey, determination, preparation and review should be recorded and filed.
Private procurement can simplify, but market supply, historical awards, follow-on spares/consumables and representative suppliers remain useful. The page need not publish the survey details, but should show the basis and revision date of the requirement.
| Case | What to do | Evidence | Common gap |
|---|---|---|---|
| RMB 10m+ goods/services | Requirement survey | Survey record | No survey |
| RMB 30m+ works | Requirement survey | Survey record | No survey |
| Public interest/high attention | Survey + opinions | Record/opinions | No record |
| Complex/imported | Survey/argument | Minutes | Guesswork |
| General project | Simplified survey | 3 respondents/representative | One source |
| Follow-on purchase | O&M/spares/consumables | List/prices | First purchase only |
| Filing | Survey/determination/review records | File | No file |
Survey requirements follow Cai Ku [2021] No. 22; private procurement may simplify with records.
How should technical specifications be written to be quotable and acceptable?
Technical specifications should at least state: use/application scenario; function and quality indicators; performance (capacity, accuracy, speed, energy, noise, etc.); material/structure/dimensions/appearance; interface/compatibility/installation; environmental conditions and safety protection; test methods and test conditions; service content and standards. Indicators should be objective and measurable, with grades for continuous ranges; do not replace numbers with "premium/imported grade/industry-leading". Where a supplier must propose a solution, state the objective, boundary and evaluation indicators so suppliers quote on the same basis.
Acceptance checks: does each indicator have a value/unit/test method; is there a decision rule; are test environment/instrument/sample stated; are critical and general characteristics separated; are equivalent alternatives and proof methods allowed? Common gaps: parameter table without test method; inconsistent accuracy/speed basis; material only "stainless steel"; interface only "standard"; environmental conditions missing; safety only "meets requirements".
| Element | What to write | Evidence | Common gap |
|---|---|---|---|
| Use/scenario | Where used, boundary, environment | Scenario note | Name only |
| Performance | Value/unit/conditions | Test report | No basis |
| Material/structure | Material/dimensions/drawing no. | Drawing/BOM | No drawing |
| Interface/compatibility | Protocol/dimensions/installation | Interface drawing | "Standard" only |
| Environment/safety | Temperature/protection/certification | Standard/report | Environment omitted |
| Test method | Method/instrument/conditions | Standard/work instruction | "Tested" only |
| Service | Content/standard/staff | SLA/commitment | Verbal service |
Technical specification is editorial; the project, standards and contract control the indicators.
How should commercial terms be written to avoid disputes?
Commercial terms should at least state: delivery/implementation time and period, place/scope, batches; payment terms (progress/method/invoice/tax); packaging and transport; insurance; after-sales service (response time, warranty period, spares/consumables, training); acceptance and delivery standards; warranty scope. Cai Ku [2021] No. 22 lists delivery time and place, payment terms, packaging and transport, after-sales service and insurance as commercial requirements; private procurement can use the same checklist. The same measures require the contract text to include all statutory clauses and all content of the procurement requirement, including subject name, quality, quantity (scale), performance time/place/method, packaging, price or remuneration, payment progress, acceptance/delivery standards and methods, and warranty scope; the SOW clauses should flow into the contract, not create a second set of terms.
Acceptance checks: is the time start point stated; is the place a specific address/consignee; is payment linked to acceptance/invoice; does packaging cover transport/stacking/marking; who buys insurance, which cover and amount; is after-sales response in hours/working days; are spares listed with price/lead time. Common gaps: only "payment before shipment"; delivery counted from "order" or "advance payment" unclear; packaging only "wooden case"; after-sales only "lifetime maintenance".
| Term | What to write | Evidence | Common gap |
|---|---|---|---|
| Delivery | Start point/period/batch/place | Plan/contract | "ASAP" |
| Payment | Progress/method/invoice/tax | Contract/finance | "Payment first" |
| Packaging/transport | Case/pallet/marking/stacking | Packaging spec | "Wooden case" |
| Insurance | Who buys/cover/amount | Policy | Not agreed |
| After-sales | Response/warranty/spares/training | SLA/list | "Lifetime" |
| Acceptance | Standard/method/period | Acceptance plan | "Accepted" |
| Warranty | Scope/period/exclusions | Contract | Unclear scope |
Commercial terms reference Cai Ku [2021] No. 22; private procurement follows the contract.
How should acceptance methods be written to be executable?
Acceptance should at least state: object/batch; sampling plan or full inspection; test method/standard/instrument/environment; decision rule (pass/fail/concession); witness (purchaser/supplier/third party); report/certificate/record; nonconformity handling (rework/repair/concession/return); correction period and re-inspection. Under the Civil Code, the buyer should inspect within the agreed inspection period; without a period, it should inspect promptly. If a period is agreed, the buyer should notify the seller of quantity/quality nonconformity within it; failure to notify is deemed conformity. Without a period, the buyer should notify within a reasonable period after discovery or when it should have discovered; failure to notify within two years of receipt is deemed conformity (a quality warranty period applies instead; the limitation does not apply if the seller knew or should have known). If the agreed inspection period is too short to complete a full inspection, it is only a period for apparent defects; a statutory period prevails. If no period is agreed, signing a delivery note/confirmation stating quantity/model/specification presumes inspection of quantity and apparent defects, unless contrary evidence exists.
So the SOW acceptance clause must connect to the contract inspection period, warranty period and notice method; "payment after acceptance" alone is not enough. Common gaps: no sampling plan; no test method; vague decision rule; nonconformity only "correct"; re-inspection cost/time unclear; signing deemed acceptance; inspection and warranty periods mixed.
| Item | What to write | Evidence | Common gap |
|---|---|---|---|
| Object/batch | Model/batch/quantity | List | Unclear scope |
| Sampling | Plan/ratio/full inspection | Sampling standard | No plan |
| Method | Standard/instrument/environment | Work instruction | "Tested" |
| Decision | Pass/fail/concession | Decision table | "Basically OK" |
| Witness | Purchaser/supplier/third party | Witness record | No witness |
| Report | Report/certificate/record | Report | No report |
| Nonconformity | Rework/concession/return | Disposition | "Correct" only |
| Re-inspection | Period/cost/rule | Re-inspection record | No limit |
Acceptance references Civil Code Articles 620–623; the contract controls the specifics.
How should standards be cited and version errors avoided?
The Standardization Law divides standards into national, industry, local, group and enterprise standards. National standards are mandatory or recommended; industry and local standards are recommended. Mandatory standards must be implemented; the state encourages the use of recommended standards. Products or services that do not conform to mandatory standards may not be produced, sold, imported or supplied; technical requirements for export products or services follow the contract. An enterprise must disclose the number and name of the mandatory, recommended, group or enterprise standard it implements; if it implements its own enterprise standard, it must also disclose the product/service functional and performance indicators.
An SOW should cite "number + year + title + mandatory/recommended", not just "meets national/EU standards". Under Civil Code Article 511, where quality is unclear, performance follows the mandatory national standard; if none, the recommended national standard; if none, the industry standard; if none, the usual standard or the specific standard fitting the contract purpose. Standards are revised; state the version/date, withdraw the old version or define a transition. For export products, the contract may set the technical requirements under Article 26 of the Standardization Law, but do not assume this displaces other applicable rules.
| Standard type | Effect/how to cite | Evidence | Common gap |
|---|---|---|---|
| Mandatory national | Must be implemented; number/year | Standard text | "National standard" |
| Recommended national | Encouraged; number/year | Standard text | Treated as mandatory |
| Industry | Recommended; industry code | Standard text | Wrong code |
| Local | Recommended; DB code | Standard text | Cross-region use |
| Group/enterprise | Disclose number/title/indicators | Public platform | Not disclosed |
| Export product | Technical requirements per contract | Contract | No contract term |
| Revision | Version/date/transition | Update record | Old version |
Standard effect follows the Standardization Law; the quality gap-filling order follows Civil Code Article 511.
How should changes, deviations and versions be managed?
An SOW needs a revision number, issue date, effective date, preparer/reviewer/approver and change log. Changes may be technical (performance/material/structure/interface/standard), commercial (delivery/payment/packaging/after-sales), supplier/substitute material, or regulatory/standard revision; each needs a trigger, impact assessment (price/lead time/inventory/certification), approver, effective batch and old-version disposition. Supplier deviations should use a deviation list/compliance matrix to state "comply/deviate/not applicable" item by item with evidence; major deviations need customer/engineering/quality approval, not verbal default.
Acceptance checks: revision/date; change log; impact assessment; approval; effective batch; old-version recall/withdrawal; deviation list; evidence. Common gaps: parameters changed by chat; old version still in use; change not assessed for price/lead time; deviation only "equivalent"; substitute material not approved; standard revision not updated.
| Change | What to do | Record | Common gap |
|---|---|---|---|
| Technical | Assess performance/material/interface/standard | ECN/change form | Verbal change |
| Commercial | Assess delivery/payment/packaging/service | Supplement | Not updated |
| Substitute material | Sample/validation/approval | Substitute list | Not approved |
| Standard revision | Gap/transition/old withdrawal | Standard list | Old version |
| Revision | Number/date/effective | Revision record | No revision |
| Deviation | Comply/deviate/not applicable | Deviation list | "Equivalent" |
| Old version | Recall/withdraw/mark | Recall record | Mixed use |
Change/deviation management is editorial; the project documents and contract control.
How should supplier responses and deviation lists be accepted?
A supplier response should at least include: an item-by-item compliance matrix (specification clause—response—evidence—conclusion); a deviation list (deviation/not applicable/alternative); a price breakdown by specification/quantity/delivery/service; delivery/capacity/critical parts; test reports/certificates/samples/PPAP; after-sales/spares/training. The purchaser should be able to compare the response clause by clause, not just read a total price. A deviation should state "what deviates, why, what impact, what alternative, what evidence", not just "meets/exceeds".
Acceptance checks: clause number; item-by-item response; evidence; deviation; alternative; price correspondence; delivery/capacity. Common gaps: total price only; hidden deviations; evidence does not match the model; substitute not validated; delivery without capacity basis; after-sales without a spare-parts list.
| Response item | What to submit | Evidence | Common gap |
|---|---|---|---|
| Compliance matrix | Clause—response—conclusion | Matrix | "Meets" only |
| Deviation list | Deviation/reason/impact/alternative | Deviation list | Hidden deviation |
| Price | Breakdown by spec/quantity/delivery | Quotation | Total only |
| Delivery/capacity | Schedule/critical parts/risk | Plan | No basis |
| Test/certificate | Model match/validity | Report/certificate | Model mismatch |
| Sample/PPAP | Sample/dimensions/material/performance | PPAP | Not validated |
| After-sales | Response/spares/training | List/SLA | Verbal promise |
Response/deviation lists are editorial; the procurement documents and contract control.
How should the SOW/technical specification page be written?
Suggested content: (1) scope/category/applicable projects; (2) technical specification summary (use, performance, material/structure, interface, environment/safety, test method); (3) commercial terms (delivery, payment, packaging/transport, insurance, after-sales, spares); (4) standard list (number/year/title/mandatory or recommended); (5) acceptance method (sampling/test/decision/report/re-inspection); (6) deviation/response requirements; (7) change/revision; (8) NDA/download/contact. The public page should show only the summary and an application entry; full drawings/BOM/customer data/cost stay behind an NDA. State the revision, date, applicable project and "the contract controls".
Use consistent English terms (SOW, technical specification, scope, performance, interface, acceptance criteria, sampling, deviation, ECN, NDA, revision) and state the review date. Link to the quotation/RFQ, contract/technical agreement and supplier development/sourcing pages, but do not present a procurement SOW as a product sales specification.
| Section | What to write | Evidence | Avoid |
|---|---|---|---|
| Scope/category | Applicable project/boundary/exclusions | Project list | Unclear scope |
| Technical | Performance/material/interface/environment/safety/test | Drawing/standard | "Custom" only |
| Commercial | Delivery/payment/packaging/insurance/service | Contract/plan | "To be negotiated" |
| Standards | Number/year/title/effect | Standard text | "Meets national" |
| Acceptance | Sampling/method/decision/report/re-inspection | Acceptance plan | "Accepted" |
| Deviation/response | Matrix/deviation/evidence | Template | Hidden deviation |
| Change/revision | Revision/date/effective/old | Revision record | No revision |
| NDA/contact | Application/access/contact | NDA/page | Full drawings public |
This structure is editorial; external statements must be truthful and verifiable, per the procurement documents and contract.
What must not be written?
High-risk claims: "meets national standards" without number/year/mandatory or recommended; "customizable" without boundary/acceptance; "equal or better" without a decision rule; "accepted" without sampling/method; "final interpretation belongs to us" (excludes the other party and invites dispute); "brand/model specified" without justification; "standard valid forever" (standards are revised); "signing means accepted" (Civil Code Article 623 is a presumption, rebuttable); "verbal change counts" (no revision/approval); "lifetime maintenance" (no scope/SLA). These are unverifiable or misstate scope, standards, acceptance or responsibility.
Safer wording: "This SOW is revision [number/date], for [project/category]; technical indicators [value/unit/test method]; references [standard number/year/title/mandatory or recommended]; acceptance by [sampling/method/decision/report/re-inspection]; deviations stated item by item in [deviation list]; changes effective after [ECN/revision] approval; full drawings/BOM available under NDA. The procurement documents and contract control." External promotion must comply with advertising and fair-competition rules; customer, price and drawing data need authorisation or redaction.
Go-live acceptance checklist
Ten checks: scope, technical specification, commercial terms, standards, acceptance method, deviation/response, change/revision, public/confidential, evidence/annexes, page wording/date. Each needs an owner, evidence and review date. The pass condition is not "the page says SOW", but that procurement/engineering/quality/suppliers can find the clauses, indicators, standards, acceptance method and revision.
Before go-live, run one real procurement package through: scope → technical specification → commercial → standards → acceptance → deviation → change → NDA/download → page wording. Any step that fails is a gap in the SOW or the page.
| Check | Pass condition | Evidence | If it fails |
|---|---|---|---|
| Scope | Subject/boundary/exclusions | Project list | Add scope |
| Technical | Value/unit/method | Drawing/standard | Add indicators |
| Commercial | Delivery/payment/packaging/service | Contract/plan | Add terms |
| Standards | Number/year/effect | Standard text | Fix citation |
| Acceptance | Sampling/method/decision/re-inspection | Acceptance plan | Add method |
| Deviation/response | Matrix/deviation/evidence | Template | Add template |
| Change/revision | Revision/effective/old | Revision record | Add process |
| Public/confidential | Summary public/full NDA | Access/NDA | Tighten access |
| Evidence/annexes | Drawings/BOM/reports traceable | Annex list | Add annexes |
| Wording/date | No "meets national/final interpretation" | Page | Rewrite |
This checklist is editorial; the project documents, contract and regulations control.
Who should read this, who should not, and what decisions does it support?
It suits procurement, engineering, quality, regulatory and website teams at equipment, electronics/electrical, automotive, medical device, hardware, chemical, packaging and export manufacturers in Changzhou and nearby areas; also companies writing an SOW for the first time, or facing frequent specification changes, acceptance disputes or inconsistent supplier quotations. It does not suit teams that only run a product sales page, do not touch procurement specifications, or want one page to replace engineering design, contract or legal advice.
Read it if you write procurement SOWs; technical indicators are not quantifiable; standards are cited without versions; acceptance has no method; deviations have no list; changes are sent by chat. Skip it if "meets national standard" is treated as a specification, "equal or better" as a decision rule, signing as acceptance, or the page is expected to promise "lifetime maintenance". It supports self-review of scope, technical specification, commercial terms, standards, acceptance, deviation/response, change/revision, public/confidential and page wording.
FAQ
Are an SOW and a technical specification the same?
Not exactly. An SOW is broader, usually covering scope, technical, commercial, delivery, acceptance, responsibility and management requirements; a technical specification focuses on indicators, material/structure, interface, environment and test methods. Projects often combine them into one procurement requirement/technical specification, but commercial terms, acceptance and change control should not be dropped.
Is a requirement survey mandatory?
In government procurement, a survey should be conducted for goods/services of RMB 10 million or more, works of RMB 30 million or more, projects with public interest/high attention, and technically complex/specialised projects (including custom IT and imported products); general projects may simplify. Private procurement may simplify by project, but market supply, historical awards, follow-on spares/consumables and representative suppliers are still worth recording.
Can we directly cite a national standard? Do we need the version?
Yes. Cai Ku [2021] No. 22 allows direct reference to national, industry or local standards and higher technical requirements. Cite the standard number, year, title and whether it is mandatory or recommended; when a standard is revised, update the version, assess the gap, plan the transition and withdraw or mark the old version, so suppliers do not quote/deliver to the old version.
How do we write an executable acceptance standard?
At least state the object/batch, sampling plan or full inspection, test method/standard/instrument/environment, decision rule, witness, report/record, nonconformity handling and re-inspection. Connect it to the contract inspection period, warranty period and notice method; do not write only "payment after acceptance".
What if a supplier deviates from the specification?
Use a deviation list/compliance matrix to state "comply/deviate/not applicable" item by item, with the deviation, reason, impact, alternative and evidence; major deviations need engineering/quality/customer approval and should be reflected in the contract/technical agreement. Do not accept "meets/exceeds" or verbal default.
Will publishing the SOW on the website leak technical secrets?
Publish only the scope, summary, standards, acceptance framework and application entry; keep full drawings, BOM, customer data, costs and key processes behind an NDA; set download permissions, watermark/logging, version and validity. State "subject to the NDA/contract" and do not publish unauthorised customer or price data.
One-sentence takeaway
A Changzhou manufacturer's procurement SOW/technical specification page is not about "meets national standards / customizable". It should turn scope, technical specification, commercial terms, standard number/version, acceptance method, deviation/response, change/revision and public/confidential into a reviewable checklist—so procurement, engineering, quality and suppliers can quote, contract and accept from the page.
Method and limitations
This is a review of public rules and page practice, not an audit, certification, procurement, specification, acceptance or legal opinion on any company, product or contract. No undisclosed customer, price, drawing or supplier data were used. Processes, document lists, tables and acceptance items are editorial suggestions, not procurement or legal conclusions. Cai Ku [2021] No. 22 applies to government procurement projects; private procurement may borrow the method, while rights and obligations follow the Civil Code, the contract and the project documents. Specific scope, technical indicators, standards, acceptance, deviations, changes and confidentiality depend on the latest rules, standard texts, procurement documents and contract.
Sources and scope
Information is current to 2026-11-06. The following are official pages; their text controls.
- Ministry of Finance, Cai Ku [2021] No. 22, Measures for the Management of Government Procurement Requirements: Gov.cn. Definition of procurement requirements, technical/commercial requirements, requirement survey, implementation plan, contract text, review.
- Civil Code of the People's Republic of China: Supreme People's Court. Contract contents (Article 470), unclear quality (Articles 510–511), inspection period/notice (Articles 620–623).
- Standardization Law of the People's Republic of China (2017 revision): NPC website. Standard types, mandatory/recommended, nonconforming products/services, export contracts, enterprise standard disclosure.
- Government Procurement Law of the People's Republic of China (2014 amendment): National Laws and Regulations Database. Scope, methods, supplier conditions, contract and acceptance.