Direct answer: A hazardous waste disposal service procurement/supplier qualification page is not a line saying "find a licensed disposal company". The website page should state: how waste is identified (catalogue, 8-digit code, category, characteristics, form, generation process, quantity); what to verify in the supplier (hazardous waste operating licence type/codes/capacity/validity, transport qualification, business licence, EIA/pollution permit, contingency plan, disposal facility, downstream destination); how the contract is written (types/codes, quantity, packaging/labelling, collection/transport, manifest, treatment/disposal, acceptance/reporting, audit, liability, emergency, price/termination); how the manifest runs (National Hazardous Waste Information Management System, electronic manifest, one per vehicle/vessel, receiver confirmation within five working days, data kept at least ten years, cross-province approval 12 months); how storage/labelling is managed; what ledgers/records to keep; how to prevent low-price/illegal dumping/resale; and what must not be public. On the law: the National Catalogue of Hazardous Wastes (2025 Edition, effective 1 January 2025) sets out hazardous characteristics, waste categories, industry sources, 8-digit waste codes and the exemption list; the Measures for the Administration of Hazardous Waste Transfer (effective 1 January 2022) Article 10 requires the generator to verify the carrier's/receiver's qualifications and technical capacity, sign a written contract, prepare a management plan, keep a ledger, complete and run the manifest, and verify acceptance; it prohibits providing hazardous waste to unlicensed entities under the guise of by-products. Article 20 requires electronic manifest data to be kept in the system for at least ten years; Article 27 provides that a cross-province transfer approval is valid for 12 months and may not exceed the remaining validity of the receiver's operating licence. The Measures for the Administration of Hazardous Waste Operating Licences (promulgated 2004, revised 2016) provide for comprehensive/collection licences, licence contents, a five-year comprehensive licence/three-year collection licence, renewal 30 working days before expiry, and Article 15 prohibits unlicensed operation and providing waste to unlicensed entities. Information is current to 2026-11-08. This is a review of public rules and page practice, not legal, EHS or procurement advice; the law, licence, contract and local ecology/environment authority's requirements control.

This guide is for procurement, EHS, supply chain, legal, finance and website teams at equipment, electronics/electrical, automotive, medical device, hardware, chemical, packaging and export manufacturers in Changzhou and nearby areas. This page most often misses waste codes, licence scope, transport qualification, manifests, storage, ledgers and downstream destination, ending up as "has a hazardous waste licence".

Three things to remember

First identify: waste name, 8-digit code, category, characteristics, quantity, form and generation process; then verify: operating licence type/codes/capacity/validity, transport qualification, facility and downstream; finally manage the process: contract, packaging/labelling, manifest, weighing/acceptance, disposal report and a ten-year ledger. The website should state identification, qualification, manifest, storage and ledgers—not "a licence is enough".

How does this page relate to hazardous chemicals procurement, equipment decommissioning, supplier code of conduct, EHS/dual prevention and supplier onboarding pages?

The hazardous waste disposal page answers "how to identify waste, how to qualify a disposal vendor, and how to manage contract/manifest/ledger"; the hazardous chemicals procurement/supplier qualification page answers "licences, SDS, storage and emergency when buying chemicals"; the equipment decommissioning/disposal page answers "how to retire equipment, dismantle, clear data and handle oil/refrigerant/battery waste"; the supplier code of conduct page answers "labour, safety, environment and ethics requirements"; the EHS/dual prevention page answers "risk classification, hazard inspection and emergency"; the onboarding page answers "qualification, audit and confidentiality". Hazardous waste disposal is "compliance service procurement + manifest + ledger"; a chemicals procurement or equipment retirement page cannot replace it.

Common breakpoints: only the business licence is checked; the operating licence is expired or does not cover the waste code; transport has no dangerous-goods qualification; the contract omits the manifest/disposal report/downstream; low-price disposal has no downstream; waste is mixed or stored too long; the electronic manifest is not run; the receiver does not confirm within five working days; cross-province transfer is not approved; ledgers are missing; the public page discloses quantities/locations. Separate "identification—qualification—contract—manifest—storage—acceptance—ledger"; then procurement, EHS and legal share one playbook.

PageAnswersKey contentCannot replace
Hazardous waste disposalHow to identify/qualify/manage manifestCodes, licence, contract, manifest, storage, ledgerChemicals/equipment retirement/EHS
Hazardous chemicals procurementChemical qualification/safetyLicence, SDS, storage, emergencyHazardous waste disposal
Equipment decommissioningHow to retire/dismantle/clear dataMethods, responsibility, oil/refrigerant/batteryOngoing waste service
Supplier code of conductLabour/safety/environment/ethicsRequirements, remediation, exitLicence/manifest
EHS/dual preventionRisk/hazard/emergencyClassification, inspection, planDisposal vendor qualification
Supplier onboardingWhether to admitQualification, audit, confidentialityBatch-level transfer

This page map is editorial; the law, licence, contract and local authority's requirements control.

How is waste identified and coded?

First determine whether the waste is hazardous under the National Catalogue (2025 Edition): waste with toxic, corrosive, flammable, reactive or infectious characteristics, or waste that may harm the ecology/health and must be managed as hazardous waste, is listed; then check the industry source, waste category, 8-digit code (first three digits industry, next three sequence, last two category), hazardous characteristics, form, generation process, quantity, packaging and storage. The catalogue's exemption list applies only to the listed stage and conditions; "exempt" does not mean "not hazardous waste". The properties of mixed waste or waste after treatment/disposal are determined under the identification standards; do not downgrade it yourself.

Acceptance checks: name; code; category; characteristics; industry/process; form; quantity; packaging; exemption conditions; identification report. Common gaps: only "waste oil/sludge"; wrong code; industry/process mismatch; treating exemption as ordinary solid waste; no identification after mixing; no weighing; packaging/labels non-compliant.

ItemWhat to confirmEvidenceCommon gap
NameSpecific waste/sourceList/processVague
Code8-digit code/categoryCatalogue/identificationWrong code
CharacteristicsToxic/corrosive/flammable/reactive/infectiousSDS/testingNot identified
Industry/processGeneration stage/industry sourceProcess mapMismatch
Form/quantitySolid/liquid/sludge/packaging/tonnesWeighing/ledgerEstimated
ExemptionWhether/stage/conditionsCatalogue appendixTreated as ordinary
Mixing/identificationProperties after mixing/reportReportSelf-downgraded
Packaging/labelsContainer/label/compatibilityPhotos/recordNon-compliant

This identification/coding is editorial; the 2025 Catalogue, identification standards and local requirements control.

Which qualifications should the disposal vendor have?

At least: hazardous waste operating licence (comprehensive/collection; approved categories, codes, operating method, annual capacity, facility address, validity); business licence; road dangerous-goods transport qualification (if self-transporting) or carrier qualification; EIA/pollution permit/contingency plan; treatment/disposal facility and process; downstream destination/final disposal; personnel/technical capacity; penalties/incidents in the last three years; consistency of contract/invoice/manifest. A comprehensive licence is valid for five years and a collection licence for three years; renewal is 30 working days before expiry; changes/20% over-capacity/added categories require a new application. A collection licence is limited to specified waste (e.g., waste mineral oil from vehicle repair, waste Ni-Cd batteries from residents) and cannot be used as a comprehensive disposal licence.

Acceptance checks: licence type; code coverage; capacity; validity; transport qualification; business licence; EIA/pollution/contingency; facility; downstream; penalties/incidents; consistency. Common gaps: business licence only; expired licence; code not covered; over-capacity; collection licence used as comprehensive; no transport qualification; no downstream; undisclosed penalties.

QualificationWhat to confirmEvidenceCommon gap
Operating licenceComprehensive/collection, categories/codes/method/capacityLicenceScope mismatch
Validity5 years/3 years, remaining termLicenceExpired
Business licenceEntity/address/scopeLicenceOnly business licence
TransportDangerous-goods transport/vehicle/personnelLicence/IDNo qualification
EIA/pollutionFacility/process/emissionsApproval/permitMissing
ContingencyFiling/drills/materialsFiling/recordNone
FacilityAddress/process/capacity/downstreamSite/reportSubcontracted
Penalties/incidentsLast three years/rectificationSearch/declarationUndisclosed
ConsistencyContract/invoice/manifest/licenceCross-checkMismatch

This qualification check is editorial; the licence, regulations and local authority's requirements control.

What should the contract contain?

At least: waste name/code/category/characteristics/form; estimated quantity/measurement (weighing); packaging/labelling/compatibility; collection/transport (who transports, qualification, vehicle/personnel, route/time); manifest (electronic/paper, who completes, accompanying documents, exceptions); storage/treatment/disposal method and facility; acceptance confirmation/disposal report/downstream proof; audit/site inspection/GPS/weighing; compliance/penalty/incident/illegal dumping liability, indemnity and termination; emergency/leak/fire/transport incident; price/unit/minimum quantity/price adjustment; term/renewal/termination; data/confidentiality. The contract must be able to trace "where this batch finally went".

Acceptance checks: code; quantity/measurement; packaging; transport; manifest; disposal method; report; audit; liability; emergency; price; term. Common gaps: only "waste oil"; no code; no weighing; unclear transport responsibility; no manifest; no downstream; no audit; no liability/indemnity; no emergency; unclear price/termination.

ClauseWhat to writeEvidenceCommon gap
WasteName/code/category/characteristics/formList/contractVague
Quantity/measurementEstimated/weighing/weighbridgeLedgerEstimated
Packaging/labelsContainer/label/compatibilityPhotos/recordNon-compliant
TransportWho/qualification/vehicle/personnelLicence/manifestNo qualification
ManifestElectronic/paper/accompanying/exceptionsManifestNot run
DisposalMethod/facility/downstreamLicence/reportSubcontracted
ReportAcceptance/disposal proofReportNone
AuditSite/GPS/weighing/documentsAudit rightNone
LiabilityViolation/incident/dumping/indemnity/terminationClauseMissing
EmergencyLeak/fire/transport incidentPlanNone
Price/termUnit/minimum/price adjustment/terminationContractUnclear

This clause list is editorial, not a contract template or legal advice; legal/EHS should review it for the transaction.

How does the manifest run?

Hazardous waste transfer should follow the manifest system; complete and run the electronic manifest through the National Hazardous Waste Information Management System (if paper is used for special reasons, enter it into the system within 10 working days after transfer). One manifest per vehicle/vessel/other transport tool for the same waste; multiple waste types may use one manifest or one per type; if one vehicle carries waste for multiple generators, each generator completes a separate manifest. The receiver should confirm acceptance through the system within five working days; if name/quantity/characteristics/form/packaging do not match, notify the generator, decide whether to accept and report. Electronic manifest data must be kept at least ten years. Cross-province transfer requires an application to the provincial ecology/environment authority of the place of origin and consent of the receiving province; the approval is valid for 12 months and may not exceed the receiver's remaining licence validity; changes in type/quantity/method/receiver require a new application.

Acceptance checks: system; electronic manifest; one per vehicle/vessel; accompanying; receiver confirmation within 5 days; 10-year retention; cross-province approval 12 months; transport qualification; exception reporting. Common gaps: not run; paper not entered; one vehicle/multiple missing; receiver does not confirm; data lost; cross-province not approved; over-term/over-quantity; no exception report.

ItemWhat to confirmEvidenceCommon gap
SystemNational Hazardous Waste Information Management SystemManifestOffline
Electronic manifestComplete/run/accompanyManifestNot run
FrequencyOne per vehicle/vessel/toolManifestMissing
Receiver confirmationWithin five working daysSystem recordNo confirmation
RetentionAt least ten yearsSystem/archiveLost
Cross-provinceProvincial approval/12 monthsApprovalNot approved
ChangesType/quantity/method/receiverNew applicationNo application
ExceptionsMismatch/leak/incident reportRecordNo report

This manifest requirement follows the Measures for Hazardous Waste Transfer; the system and local authority's requirements control.

How should storage, packaging and labelling be managed?

Hazardous waste storage needs a designated area/facility with seepage/leak/rain/fire/ventilation controls, segregation by compatibility, no arbitrary mixing; containers/packaging intact, labels with name, code, category, characteristics, generation date/unit, quantity/weight and hazard warnings; liquids need containment, corrosives need corrosion-resistant surfaces, flammables need anti-static/ignition controls; keep inbound/outbound/inventory ledgers and periodic counts; the storage period follows the licence, EIA and local rules and must not be exceeded; overdue/over-capacity waste should be transferred promptly. The storage area needs emergency materials, leak collection, fire protection and PPE.

Acceptance checks: area; seepage/leak/fire controls; compatibility; containers; labels; ledger; inventory; period; emergency. Common gaps: open-air/mixed; missing labels; damaged containers; no seepage control; overdue; no ledger; no emergency; untrained staff.

ItemWhat to confirmEvidenceCommon gap
AreaDesignated/seepage/rain/fireSite/photosOpen-air
CompatibilitySegregation/no mixingLabels/listMixed
ContainersIntact/material/sealedPhotosDamaged
LabelsName/code/characteristics/date/unitLabelMissing
LedgerInbound/outbound/inventoryLedgerNone
PeriodLicence/EIA/local rulesRecordOverdue
EmergencyMaterials/leak/fire/PPEPlan/recordNone

This storage/labelling guidance is editorial; the licence, EIA, storage standards and local requirements control.

How to verify acceptance, disposal reports and downstream?

Weigh/measure each batch, check the manifest against the physical waste (name/code/quantity/form/packaging), and obtain the receiver's confirmation; after treatment/disposal, obtain the disposal report/receipt/downstream destination to confirm the waste was not merely received, subcontracted or dumped; periodically audit the disposal facility, process, licence scope, inventory, downstream contracts, GPS/transport routes and weighing records; for low prices, unusual discounts or vendors unable to provide downstream proof, increase audit frequency; if illegal dumping/resale is found, stop payment, terminate, report and preserve evidence.

Acceptance checks: weighing; manifest/physical; acceptance confirmation; disposal report; downstream; site audit; GPS; low-price anomaly; stop payment/report. Common gaps: no weighing; manifest/physical mismatch; no disposal report; unknown downstream; no site audit; low price not checked; no report after discovery.

StepWhat to confirmEvidenceCommon gap
WeighingWeighbridge/measurementTicketEstimated
Manifest/physicalName/code/quantity/form/packagingManifest/photosMismatch
AcceptanceWithin five working daysSystemNo confirmation
Disposal reportReceipt/treatment/disposal proofReportNone
DownstreamFinal destination/contract/licenceContract/licenceUnknown
Site auditFacility/process/inventoryAudit recordNone
Transport routeGPS/route/timeTrackNone
ExceptionsLow price/no downstream/dumpingStop payment/reportNo action

This acceptance/downstream check is editorial; the licence, manifest, disposal report and local regulator's requirements control.

What ledgers and records should be kept?

At least: hazardous waste management plan; generation/storage/transfer ledger (name, code, quantity, date, destination, receiver); electronic manifest (at least ten years); operating licence/business licence/transport qualification; contract/price/invoice; weighing/weighbridge tickets; acceptance confirmation/disposal report/downstream proof; training/emergency/drills; site audit/GPS; exceptions/penalties/rectification. The ledger must answer "how much was generated, stored, transferred, who transported it, who received it, how it was treated and where it finally went". Manifest data at least ten years; other records follow regulations/company archive policy.

Acceptance checks: plan; ledger; manifest; licence; contract/invoice; weighing; disposal report; training/emergency; audit; exceptions; retention. Common gaps: no plan; incomplete ledger; lost manifest; expired licence; contract/invoice mismatch; no disposal report; no training/emergency; insufficient retention.

RecordWhat to confirmEvidenceCommon gap
Management planTypes/quantity/flow/measuresPlanNone
LedgerGeneration/storage/transferLedgerIncomplete
ManifestElectronic/at least 10 yearsSystemLost
LicenceScope/validityCopyExpired
Contract/invoiceEntity/price/quantityContract/invoiceMismatch
WeighingTicket/measurementTicketNone
Disposal reportReceipt/treatment/downstreamReportNone
Training/emergencyPersonnel/drills/materialsRecordMissing
Audit/exceptionsSite/GPS/rectificationRecordNone

This ledger/record list is editorial; electronic manifests are kept at least ten years, other records follow regulations/company archive policy.

What are the common pitfalls?

High-risk: checking only the business licence, not the operating licence; expired licence/uncoded waste/over-capacity; using a collection licence as a comprehensive licence; transport without dangerous-goods qualification; contract without manifest/disposal report/downstream; low-price collection without treatment/subcontracting/dumping; mixed waste/missing labels/overdue storage; electronic manifest not run/paper not entered; receiver not confirming within five working days; cross-province without approval/over-term/over-quantity; missing ledger/stock mismatch; public page disclosing quantities/locations/security details. Each must be checked in qualification/contract/manifest/ledger/audit.

Acceptance checks: licence; code/capacity; transport; contract; manifest; storage; acceptance; cross-province; ledger; downstream; public boundary. Common gaps: any of the above missing.

PitfallConsequenceEvidenceCommon gap
Business licence onlyUnlicensed/out of scopeLicenceNot checked
Expired licenceIllegal transferValidityExpired
Code not coveredIllegal disposalLicence/codeMismatch
No transport qualificationIllegal transport/incidentTransport licenceNone
Low price/no downstreamDumping/subcontractingDisposal reportNone
Mixing/overdueStorage violation/incidentSite/ledgerYes
Manifest not runNo traceabilitySystemOffline
Cross-province unapprovedIllegal transferApprovalNot approved
Missing ledgerStock mismatchLedgerNone

This risk list is editorial; the licence, regulations and local regulator's requirements control.

How should the website page be written, and what must not be public?

Suggested content: (1) scope/waste categories; (2) supplier qualification requirements (operating licence, transport, facility, downstream); (3) contract/manifest/storage/ledger requirements; (4) collection/transfer/disposal process; (5) emergency/exception/complaint; (6) contact/version/update date. The public page explains "requirements and process"; it should not publish specific waste quantities, storage location/site plan, security/access control, contract prices, sensitive vendor information, manifest numbers or pending penalties/incidents; after login, suppliers can submit qualification, manifests and disposal reports.

Use consistent English terms (hazardous waste, hazardous waste disposal service, operating licence, waste code, manifest, generator, carrier, receiver, storage, treatment, disposal, ledger, downstream, cross-province transfer) and state the review date. Link to hazardous chemicals procurement, equipment decommissioning and supplier code of conduct pages, but do not turn the hazardous waste page into an equipment retirement page.

SectionWhat to writeEvidenceAvoid
Scope/categoriesWaste categories/code principlesPolicyPublish quantities
QualificationLicence/transport/facility/downstreamChecklistBusiness licence only
Contract/manifestClauses/electronic manifest/retentionTemplateNo manifest
ProcessCollection/transfer/disposal/reportProcessNo downstream
EmergencyLeak/incident/reportPlanNone
ContactEHS/procurement windowPagePersonal mobile
Public boundaryNo quantities/locations/prices/numbersAccess controlPublish everything
VersionUpdate date/ownerPageNo owner

This structure is editorial; external statements must be truthful and verifiable, per the law, licence, contract and company policy.

What must not be written?

High-risk claims: "a business licence is enough to collect hazardous waste" (an operating licence is required); "a licence covers all waste" (check category/code/capacity); "a collection licence can also dispose" (limited scope); "the manifest is just a formality" (a legal system/traceability); "hazardous waste can be mixed/stored indefinitely" (compatibility/period); "low-price disposal saves money" (possible subcontracting/dumping); "publish specific quantities/locations" (sensitive); "transfer is the end" (acceptance confirmation/disposal report/downstream). These are inaccurate or misstate qualification, manifest, storage or the public boundary.

Safer wording: "This page applies to [waste category]; the supplier must hold a [comprehensive/collection] operating licence covering the category/code/capacity/validity, and transport must have dangerous-goods qualification; the contract covers [packaging/manifest/disposal/report/audit/liability]; transfers run through the National Hazardous Waste Information Management System, the receiver confirms within five working days, and data is kept at least ten years; cross-province transfer requires provincial approval. The law, licence and local ecology/environment authority's requirements control."

Go-live acceptance checklist

Ten checks: waste identification/code; licence/transport/facility/downstream; contract clauses; electronic manifest; storage/labelling; acceptance/disposal report; ledger/retention; cross-province approval; exception/low-price prevention; public boundary and version. Each needs an owner, evidence and review date. The pass condition is not "the page says the vendor is licensed", but that procurement, EHS and legal can identify, verify, contract, run the manifest, manage storage, verify downstream and keep ledgers from the page.

Before go-live, run one real (anonymised) hazardous waste batch through: identification/code → supplier qualification → contract → packaging/labelling → weighing → electronic manifest → transport → acceptance → disposal report → ledger. Then simulate a cross-province transfer and a licence expiry to see whether approval/renewal/suspension works. Any step that fails is a gap in the page or the process.

CheckPass conditionEvidenceIf it fails
Identification/codeName/code/category/characteristicsCatalogue/identificationAdd identification
Qualification/downstreamLicence/transport/facility/downstreamDocuments/reportChange vendor
Contract clausesCode/manifest/disposal/liabilityContractAmend contract
Electronic manifestSystem/per vehicle/accompanyingManifestRun manifest
Storage/labellingArea/compatibility/labels/periodSite/ledgerRectify
Acceptance/report5-day confirmation/disposal reportSystem/reportConfirm
Ledger/retentionGeneration/storage/transfer/10 yearsLedgerBuild ledger
Cross-provinceProvincial approval/12 monthsApprovalApprove
Exception/low priceStop payment/report/auditRecordAdd process
Public boundaryNo quantities/locations/pricesAccess controlRemove

This checklist is editorial; the law, licence, contract and local requirements control.

Who should read this, who should not, and what decisions does it support?

It suits procurement, EHS, supply chain, legal, finance and website teams at equipment, electronics/electrical, automotive, medical device, hardware, chemical, packaging and export manufacturers in Changzhou and nearby areas; also companies looking for hazardous waste disposal vendors or facing "expired licence/code not covered/manifest problems/cross-province transfer/low-price dumping". It does not suit teams that do not generate hazardous waste or sign waste service contracts, or want one page to replace legal/EHS advice.

Read it if you are building a hazardous waste disposal page; only the business licence is checked; the licence is expired; the code is not covered; transport has no qualification; the contract omits manifest/disposal report; low price without downstream; mixing/overdue storage; cross-province unapproved; ledger missing. Skip it if you treat "licensed" as "can accept everything", "manifest" as a formality, "low price" as saving money, or want to publish quantities/locations. It supports self-review of identification, qualification, contract, manifest, storage, acceptance, ledger and page wording.

FAQ

Which qualifications should a hazardous waste disposal vendor have?

At least a hazardous waste operating licence (comprehensive/collection, covering categories/codes/capacity/validity), business licence, road dangerous-goods transport qualification (self-transport or carrier), EIA/pollution permit/contingency plan, treatment/disposal facility/process/downstream. A comprehensive licence is valid for five years and a collection licence for three; a collection licence is limited to specified waste and cannot be used as a comprehensive licence. Also check penalties/incidents in the last three years and contract/invoice/manifest consistency.

How is the manifest completed and how long is it kept?

Complete and run the electronic manifest through the National Hazardous Waste Information Management System; one per vehicle/vessel/other transport tool for the same waste, or one per type; the receiver confirms within five working days; electronic manifest data is kept at least ten years; if paper is used for special reasons, enter it within 10 working days after transfer. The manifest must accompany the vehicle and match the physical waste; exceptions must be reported.

How is a cross-province transfer approved?

Apply to the provincial ecology/environment authority of the place of origin; it must consult and obtain the consent of the receiving province before approval. The approval is valid for 12 months and may not exceed the remaining validity of the receiver's operating licence; changes in type/quantity/method/receiver require a new application. No transfer without approval.

Can hazardous waste be mixed or stored beyond the period?

Do not mix arbitrarily; segregate by compatibility, keep containers intact, label clearly, and provide seepage/leak/fire/emergency controls. The storage period follows the licence, EIA and local rules and must not be exceeded; overdue/over-capacity waste should be transferred promptly. The properties of mixed waste are determined under the identification standards; do not treat it as ordinary solid waste.

How to prevent low-price disposal/illegal resale?

Check the licence/codes/capacity/facility/downstream; be alert to prices materially below market/disposal cost; conduct site audits, GPS/route checks, weighing, manifest and disposal reports; the contract should provide audit/stop-payment/termination/indemnity; if subcontracting/dumping/resale is found, stop payment, terminate, report and preserve evidence. Do not choose on price alone.

Should the website publish hazardous waste types/quantities/vendors?

Usually not specific types/quantities, storage locations/site plans, security/access control, contract prices, sensitive vendor information, manifest numbers or pending penalties/incidents. The public page can explain qualification requirements, process, emergency/contact window and compliance commitment; detailed materials should be submitted/logged in after login or provided under control.

One-sentence takeaway

A Changzhou manufacturer's hazardous waste disposal service procurement/supplier qualification page is not about "a licence is enough". It should turn waste identification/codes, operating licence/transport/facility/downstream, contract, electronic manifest, storage/labelling, acceptance/disposal report, ten-year ledger and cross-province approval into a reviewable checklist—so procurement, EHS and legal can identify, verify, contract, run the manifest, manage storage, verify downstream and keep ledgers.

Method and limitations

This is a review of public rules and page practice, not legal, EHS or procurement advice. No undisclosed hazardous waste quantities, licences, manifests, contracts or penalty data were used; classifications, tables and acceptance items are editorial, not legal conclusions. The National Catalogue of Hazardous Wastes (2025 Edition, effective 1 January 2025) on hazardous characteristics, categories, industry sources, 8-digit codes and exemptions; the Measures for the Administration of Hazardous Waste Transfer (effective 1 January 2022) Article 10 generator obligations, Article 20 ten-year electronic manifest retention, Article 27 12-month cross-province approval, Article 28 new application; the Measures for the Administration of Hazardous Waste Operating Licences (2004, revised 2016) on licence types, contents, five-year/three-year validity, renewal and Article 15 prohibition; the law, licence, contract and local ecology/environment authority's requirements control. This article does not determine whether a specific waste/vendor/transfer is compliant; companies should review item by item.

Sources and scope

Information is current to 2026-11-08. The following are official pages; their text controls.

  1. National Catalogue of Hazardous Wastes (2025 Edition) (Order No. 36 of the Ministry of Ecology and Environment and four other departments, effective 1 January 2025): The State Council of China. Hazardous characteristics, categories, industry sources, 8-digit codes and exemption list (Articles 2 to 5 and appendix).
  2. Measures for the Administration of Hazardous Waste Transfer (Order No. 23 of the Ministry of Ecology and Environment, Ministry of Public Security and Ministry of Transport, effective 1 January 2022): The State Council of China. Generator obligations (Article 10), electronic manifest/ten-year retention (Article 20), 12-month cross-province approval (Article 27), new application (Article 28).
  3. Measures for the Administration of Hazardous Waste Operating Licences (State Council Order No. 408, promulgated 2004, revised 2016): The State Council of China. Licence types/contents (Articles 3 and 10), five-year comprehensive/three-year collection validity (Article 13), renewal (Article 13), prohibition on unlicensed operation/providing waste to unlicensed entities (Article 15).
About the author

Lingyi Information Official (delivery team) supports requirements, proposals, and acceptance for enterprise websites, brand and brochure design, smart manufacturing, and AI projects. This article is public research and project practice, not legal, EHS or procurement advice; specific projects follow the law, licence, contract and company policy.

Turn hazardous waste procurement into a reviewable checklist

Bring the waste codes, licence, manifest, storage and ledger requirements. We will map the hazardous waste page into a reviewable checklist.

Book a hazardous waste procurement review